Reference January 30, 2017 Tokyo Electric Power Company Holdings, Inc.

Pre-investigation results of the area inside the pedestal

for the Unit 2 Primary Containment Vessel Investigation

at Fukushima Daiichi Nuclear Power Station

(2)

The purpose of this investigation is to inspect the platform inside the pedestal, fuel debris fallen to the Control Rod Drive (CRD), and structures inside the pedestal.

Today, preparatory investigation was conducted for X-6 penetration and CRD exchange rail which the self-propelled Scorpion robot will take to the pedestal.

1. Unit 2 Primary Containment Vessel investigation

Investigation area inside the pedestal

RPV

X-6 penetration

Primary Containment Vessel (PCV)

Control Rod Drive

(CRD) exchange rail Pedestal opening Pedestal

Platform Control Rod Drive (CRD)

Basement floor

Today’s

investigation area

About 7.2m

(3)

Step 1. Drilling device carried in Step 3. Drilling on X-6 penetration

Step 7. Investigation using self- propelled investigation device Step 5. Pre-investigation

inside pedestal using guide pipe

X-6 penetration Drilling device Hole saw

Isolation unit*

Drilling device X-6 penetration Isolation

Drilling device

X-6 penetration Shielding

Step 2. Drilling device set up

Self-propelled investigation device

*Combination of isolation and shielding Clamp

Step 6. Obstacle removal device inserted*

Obstacle removal device Pan-tilt

camera Step 4. Pre-

investigation of X-6 penetration and CRD rail using guide pipe

Pan-tilt camera X-6 penetration

CRD rail

X-6 penetration CRD rail

Pedestal

*The device may not be inserted depending on the obstacle conditions.

3. Work steps for Unit 2 PCV investigation

(4)

自走式調査装置による調査概要

CRD rail Lifting balance Pedestal opening

Pedestal wall

Shooting range

Platform Alternative shielding

Control Rod Drive (CRD) Isolation valve Guide pipe

(Φ110mm)

Pedestal

Inside of Primary Containment Vessel X-6 penetration

Pan-tilt camera and lights

Step 4

3-1. Pre-investigation results for the area inside the pedestal

(5)

パンチルトカメラ・照明

TIP guiding pipe

CRD rail and platform opening Flat bar

On the side of platform No grating

Flat bar No grating

Deposits CRD bottom

3-2. Pre-investigation results for the area inside the pedestal

(6)

 The pre-investigation was conducted as planned. In the pre-investigated area,

• No changes in positions of Control Rod Drive (CRD) housing, Position Indication Probe (PIP) cable, and CRD exchanger

• A part of the grating deformed

• Some deposits on the CRD rail and grating found

• Water dripping found in some areas

 Visual images obtained through this pre-investigation will be analyzed to

determine whether a rubble removal device and a self-propelled investigation robot can be inserted.

 The Unit 2 PCV is stably cooled because no abnormalities in reactor core cooling have been found in PCV/RPV temperatures and plant parameters such as parameters related gases inside the PCV.

 No leakage has been found to the outside of PCV because air tightness is secured by using isolation valve and O-ring during the pre-investigation work and the area around the O-ring is pressurized more than the pressure inside the PCV.

 No external impacts have been found from the radiation doses inside the PCV because they are appropriately managed by buildings and shielding.

4. Summary

(7)

Remote operation room

in the main administrative office

Inside the Unit 2 Reactor Building

Reference: Work site scenes

The pre-investigation was conducted by remotely operating the camera in the remote operation room and by inserting/pulling out the guide pipe at the field headquarters and inside the Unit 2 Reactor Building.

Work site scenes

参照

関連したドキュメント

TEPCO Holdings is committed to steadily completing the decommissioning of Fukushima Daiichi Nuclear Power Station putting safety above all else. We will provide a concreate plan