Fukushima Daiichi Nuclear Power Station

Unit 2 Primary Containment Vessel Internal Investigation Results (Bulletin)

January 19, 2018

Tokyo Electric Power Company Holdings, Inc.

<Reference>

(2)

2

【Investigation Plan】: The area underneath the platform, where fuel debris may exist, was checked.

Scope of this PCV internal investigation

RPV

Containment vessel penetration used for this investigation (X-

6 penetration) Primary containment vessel (PCV)

Control rod drive mechanism (CRD) replacement rails

Pedestal opening Pedestal

Platform Control rod drive mechanism (CRD)

housing Scope of this investigation

Worker access opening Approx. 7.2m

Containment vessel penetration used for previous investigations

(X-53 penetration)

Sub-floor

1. Primary containment vessel internal investigation overview

Area where equipment was lowered during this investigation

(3)

3

2. Internal investigation results (bulletin) (1/2)

※Investigation position is tentative Photos provided by: International Research Institute for Nuclear Decommissioning (IRID)

Fuel assembly component

CRD replacement mechanism Platform

CRD housing

Fallen grating ①

CRD rails

Worker access opening Bottom of the pedestal

Cable tray No Holes

Middle work platform Telescoping investigation device

No Holes Fallen grating ②

(4)

4

2. Internal investigation results (bulletin) (2/2)

※Investigation position is tentative

Platform CRD housing

Fallen grating ①

CRD rails

Worker access opening Cable tray No Holes

Middle work platform Telescoping investigation device

No Holes Fallen grating ②

CRD replacement mechanism

Bottom of the pedestal

(5)

5

Field command center Remote operations center

Work outside the PCV (In front of X-6 penetration)

Feed from overhead camera 1

(Lowering the investigation unit) Feed from overhead camera 2

(Lowering the investigation unit)

3. Work Conditions

Photos provided by: International Research Institute for Nuclear Decommissioning (IRID)

(6)

6

【 Investigation Results Summary 】

・The internal investigation was completed as scheduled.

・The entire bottom of the pedestal was found to be covered with sandy and clay-like deposits.

・Some fuel assembly components have fallen to the bottom of the pedestal and deposits thought to be fuel debris were found in the vicinity of these fallen components.

・The CRD housing supports were found to be in the same condition as was seen during the January~February 2017 investigations.

・The investigation was completed while keeping worker exposure doses under planned limits.

・No significant fluctuations were seen in data from monitoring

posts or dust monitors neither prior to, nor after, the investigation.

【Plans going forward】

・The photos taken during this investigation will be analyzed and radiation level/temperature data assessed.

4. Summary

(7)

7

There was no impact on the surrounding environment from radiation during internal investigation of the Unit 2 primary containment vessel conducted on January 19.

During the investigation a boundary was constructed to prevent the gases from inside the containment vessel from leaking into the external environment.

No significant fluctuations in data from monitoring posts and dust monitors were seen neither prior to, nor after, the investigation.

Data from monitoring posts and dust monitors near site boundaries can be found on our website.

URL:http://www.tepco.co.jp/en/nu/fukushima-np/f1/index-e.html

http://www.tepco.co.jp/en/nu/fukushima-np/f1/dustmonitor/index-e.html

5. Environmental Impact(1/2)

(Reference) Website Excerpt

*Radiation levels include contributions from radiation sources other than the inside of the primary containment vessel.

(8)

8

During the investigation, plant parameters were continuously monitored and no significant fluctuations were seen in the temperature of the primary containment vessel neither prior to, nor after, the investigation. There were also no changes in the cold shut down status of the reactor.

Primary containment vessel internal temperature data can be viewed on our website.

URL:http://www.tepco.co.jp/en/nu/fukushima-np/f1/plantdata/unit2/pcv_index-e.html

5. Environmental Impact(2/2)

(Reference) Website Excerpt

(9)

9

Reference: PCV Internal investigation location

Worker access opening Bottom of the pedestal

垂直断面図 Telescoping investigation device

CRD housing

Fallen grating① Fallen grating②

CRD rails No holes

No holes

Middle work platform

Cable tray

CRD replacement mechanism Platform

Area that the investigation unit accessed during this investigation (tentative)

(10)

10

Reference: Fuel assembly component (top tie-plate)

Fuel assembly component (top tie-plate) drawing

参照

関連したドキュメント

In Germany, a distinction is made between external and internal freedom of the press: external freedom of the press refers to the independence of the press from the state,

No toxicological effects warranting significant target organ toxicity classification were seen below the recommended guidance values for classification., Respiratory irritation. Oral

Amount of Remuneration, etc. The Company does not pay to Directors who concurrently serve as Executive Officer the remuneration paid to Directors. Therefore, “Number of Persons”

This dose investigation was carried out using “RISER”, a drone equipped with a dosimeter, to check conditions in areas inside the Fukushima Daiichi Nuclear Power Station Unit

Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station... The purpose of

⇒ The CR was fully inserted and the CR index tube was stored in CRD guide tube at the time of the accident, so it is assumed that the cylindrical structure is CR guide tube and

 Shadows of concrete walls surrounding around the primary containment vessel were captured.  Shadows were captured in a position where the spent fuel pool is supposed to be. 

• The self-propelled investigation device ran on the deposits of the CRD rail and reached the area toward the pedestal (the vicinity of hanging balance), further than the area