Reference January 26, 2017 Tokyo Electric Power Company Holdings, Inc.

Pre-investigation results of X-6 penetration

for the Unit 2 Primary Containment Vessel Investigation

at Fukushima Daiichi Nuclear Power Station

(2)

The purpose of this investigation is to inspect the platform inside the pedestal, fuel debris fallen to the Control Rod Drive (CRD), and structures inside the pedestal.

Today, preparatory investigation was conducted for X-6 penetration and CRD exchange rail which the self-propelled Scorpion robot will take to the pedestal.

RPV

1. Unit 2 Primary Containment Vessel investigation

Today’s

investigation

area About 7.2m

Investigation area inside the pedestal

X-6 penetration Primary Containment

Vessel (PCV)

Control Rod Drive (CRD) exchange railPedestal opening

Pedestal

Platform Control Rod Drive (CRD)

Basement floor

(3)

Step 1. Drilling device carried in Step 3. Drilling on X-6 penetration

Step 7. Investigation using self- propelled investigation device Step 5. Pre-investigation

inside pedestal using guide pipe

X-6 penetration Drilling device Hole saw

Isolation unit*

Drilling device X-6 penetration Isolation

Drilling device

X-6 penetration Shielding

Step 2. Drilling device set up

Self-propelled investigation device

*Combination of isolation and shielding Clamp

Step 6. Obstacle removal device inserted*

Obstacle removal device Pan-tilt

camera

Step 4. Pre-investigation of X-6 penetration and CRD rail using guide pipe

Pan-tilt camera X-6 penetration

CRD rail

X-6 penetration CRD rail

Pedestal

*The device may not be inserted depending on the obstacle conditions.

3. Work steps for Unit 2 PCV investigation

The step taken today

(4)

パンチルトカメラ・照明 Scaffold

Sling

Inside of isolation unit

Surface of X-6 penetration

Cable

Inside of X-6 penetration Inside of X-6 penetration

3. Pre-investigation results for X-6 penetration (1/3)

Shooting range

Platform

Alternative shielding Control Rod Drive (CRD)

Outlie of pre-investigation for X-6 penetration and CRD rail using guide pipe Isolation valve

Radiation dose inside PCV:

about 73 Sv/h (Maximum measurement

value in March 2012)

Guide pipe for pre-investigation

(Φ110mm)

Pedestal

Inside of Primary Containment Vessel X-6 penetration

Pan-tilt camera and lights

Step 4

(5)

代替遮へい体

パンチルトカメラ・照明

Scaffold

CRD rail

Scaffold

CRD rail

CRD rail Scaffold

Scaffold

Sling

Shooting range

Platform

Alternative shielding Control Rod Drive (CRD)

Outlie of pre-investigation for X-6 penetration and CRD rail using guide pipe Isolation valve

Radiation dose inside PCV:

about 73 Sv/h (Maximum measurement

value in March 2012) Guide pipe for

pre-investigation (Φ110mm)

Pedestal

Inside of Primary Containment Vessel X-6 penetration

Pan-tilt camera and lights

Step 4

3. Pre-investigation results for X-6 penetration (2/3)

(6)

パンチルトカメラ・照明

CRD rail CRD rail

CRD rail

2.3m

Scaffold

Sling

Shooting range

Platform

Alternative shielding Control Rod Drive (CRD)

Outlie of pre-investigation for X-6 penetration and CRD rail using guide pipe Isolation valve

Radiation dose inside PCV:

about 73 Sv/h (Maximum measurement

value in March 2012) Guide pipe for

pre-investigation (Φ110mm)

Pedestal

Inside of Primary Containment Vessel X-6 penetration

Step 4

3. Pre-investigation results for X-6 penetration (3/3)

(7)

4. Summary

 Investigation results

• As an investigation result for X-6 penetration, necessary space was found to insert the guide pipe (about Φ110㎜) used in the next investigation steps.

• As an investigation result for CRD rail, no obstacles were found in today’s

investigation area, which could prevent next pre-investigation for the pedestal.

• Although the image is not clear around the pedestal opening due to mist, the conditions will be inspected in the next pre-investigation for the pedestal, as planned.

 Future plans

Pre-investigation will begin after necessary preparation is made, reflecting today’s pre-investigation results to the next pre-investigation plan for the pedestal.

(8)

Reference: Work site scenes

The pre-investigation was conducted by remotely operating the camera at the field headquarters and by inserting/pulling out the guide pipe

inside the Unit 2 Reactor Building.

Field headquarters Inside of Unit 2 Reactor Building

Work site scenes

参照

関連したドキュメント

Following Piñeiro [6], we denote by ᏾ bv (X,Y ) the vector space of linear operators taking compact subsets of X into sets that lie inside the range of a Y -valuedmeasure

The reader is referred to [6] for an interesting investigation into unitary represen- tations of amenable and non-amenable connected locally compact groups in terms of the

This product may also be used as an overlay application following a preplant incorporated application of a grass herbicide registered for this same use and in tank mix combinations

Amount of Remuneration, etc. The Company does not pay to Directors who concurrently serve as Executive Officer the remuneration paid to Directors. Therefore, “Number of Persons”

This dose investigation was carried out using “RISER”, a drone equipped with a dosimeter, to check conditions in areas inside the Fukushima Daiichi Nuclear Power Station Unit

Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station... The purpose of

⇒ The CR was fully inserted and the CR index tube was stored in CRD guide tube at the time of the accident, so it is assumed that the cylindrical structure is CR guide tube and

• The self-propelled investigation device ran on the deposits of the CRD rail and reached the area toward the pedestal (the vicinity of hanging balance), further than the area