Reference February 16, 2017 Tokyo Electric Power Company Holdings, Inc.
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station
(Investigation results by the self-propelled investigation device)
1
Step 1. Drilling device carried in Step 3. Drilling on X-6 penetration
Step 7. Investigation using self- propelled investigation device Step 5. Pre-investigation
inside pedestal using guide pipe
X-6 penetration Drilling device Hole saw
Isolation unit*
Drilling device X-6 penetration Isolation
Drilling device
X-6 penetration Shielding
Step 2. Drilling device set up
Self-propelled investigation device
*Combination of isolation and shielding Clamp
Step 6. Obstacle removal device inserted*
Deposit removal device Pan-tilt
camera Step 4. Pre-
investigation of X-6 penetration and CRD rail using guide pipe
Pan-tilt camera X-6 penetration
CRD rail
X-6 penetration CRD rail
Pedestal
*The device may not be inserted depending on the obstacle conditions.
1. Work steps for Unit 2 PCV investigation
2
自走式調査装置による調査概要
Investigation by the self-propelled investigation device
Pedestal opening Hanging
balance
画像提供:国際廃炉研究開発機構(IRID)
Step 72. Investigation results by the self-propelled investigation device (digital images)
Shooting range
Platform Alternative
shielding
Control Rod Drive (CRD) Pedestal
Inside of PCV X-6 penetration Isolation
valve Isolation
valve
Chamber unit
Guide pipe for pre-investigation
(Φ110mm)
Self-propelled investigation device (cameras, dosimeter, thermometer)
自走式調査装置による調査概要
About 210Sv/h*
16.5℃ Dose rate
Temperature
*・Calculated from integrating radiation dose for about four minutes.
・Estimated value from noise images: about 5-13Sv/h Note) Could be affected by the lighting
Temperatures have been evaluated from the sequentially obtained data.
Reference: temperature inside the PCV:
18.6℃ (as of 8:00 a.m.) TE-16-114C
2. Investigation results by the self-propelled investigation device (temperatures and radiation levels)
Step 7
Platform Alternative
shielding Control Rod Drive (CRD)
Pedestal
Inside of PCV X-6 penetration Isolation
valve Isolation
valve
Chamber unit
Guide pipe for pre-investigation
(Φ110mm)
Investigation by the self-propelled investigation device
Control Rod Drive (CRD)
4
Today’s investigation results
• The self-propelled investigation device ran on the deposits of the CRD rail and reached the area toward the pedestal (the vicinity of hanging balance), further than the area where the deposit removal device reached.
• It tried to move further toward the pedestal but could not reach there because the crawler belt on the left side could not move any more.
• It investigated temperatures and radiation levels on the CRD rail as well as conditions of surrounding structures.
• The connection cable was cut and the device was left on the side of the CRD rail not to obstruct further investigations.
Plans for further examination
TEPCO will continue to evaluate the information, such as deposits on the CRD rail and conditions inside the pedestal, obtained from this entire
investigation.
4. Summary
自走式調査装置による調査概要
Guiding pipe slope
CRD rail
End of CRD rail
Investigation by the self-propelled investigation device Step 7
Shooting range
Platform Alternative
shielding
Control Rod Drive (CRD) Pedestal
Inside of PCV X-6 penetration Isolation
valve Isolation
valve
Chamber unit
Guide pipe for pre-investigation
(Φ110mm)
Self-propelled investigation device (cameras, dosimeter, thermometer)
Images provided from International Research Institute
for Nuclear Decommissioning (IRID) Location where the device was left
Reference: Location where the device was left