Major Facilities

N/A
N/A
Protected

Academic year: 2022

シェア "Major Facilities"

Copied!
1
0
0

読み込み中.... (全文を見る)

全文

(1)

Imaichi Tochigi Pref. 1,050 Dam and conduit*

Shiobara Tochigi Pref. 900 Dam and conduit*

Tambara Gunma Pref. 1,200 Dam and conduit*

Kannagawa Gunma Pref. 940 Dam and conduit*

Kazunogawa Yamanashi Pref. 800 Dam and conduit*

Azumi Nagano Pref. 623 Dam and conduit*

Shin-Takasegawa Nagano Pref. 1,280 Dam and conduit*

Total hydroelectric power output (All facilities) 9,453

*Pumped storage

Ohi Tokyo 1,259 Crude oil and city gas

Shinagawa Tokyo 1,140 City gas

Yokosuka Kanagawa Pref. 2,528 Heavy oil, crude oil, light oil and city gas

Kawasaki Kanagawa Pref. 2,128 LNG

Yokohama Kanagawa Pref. 3,325 LNG, heavy oil, crude oil and NGL Minami-Yokohama Kanagawa Pref. 1,150 LNG

Higashi-Ohgishima Kanagawa Pref. 2,000 LNG

Chiba Chiba Pref. 3,882 LNG

Goi Chiba Pref. 1,886 LNG

Anegasaki Chiba Pref. 3,606 LNG, heavy oil, crude oil, LPG, NGL and light oil

Sodegaura Chiba Pref. 3,600 LNG

Futtsu Chiba Pref. 5,040 LNG

Kashima Ibaraki Pref. 5,204 Heavy oil, crude oil and city gas Hitachinaka Ibaraki Pref. 1,000 Coal

Hirono Fukushima Pref. 3,800 Heavy oil, crude oil and coal Total thermal power output (All facilities) 41,598

Fukushima Daiichi Fukushima Pref. 1,884 BWR Fukushima Daini Fukushima Pref. 4,400 BWR Kashiwazaki-Kariwa Niigata Pref. 8,212 BWR, ABWR Total nuclear power output (All facilities)** 14,496

Nishi-Gunma Trunk Line Overhead 500*** 167.99

Minami-Niigata Trunk Line Overhead 500*** 110.77

Minami-Iwaki Trunk Line Overhead 500*** 195.40

Fukushima Trunk Line Overhead 500 181.64

Fukushima Higashi Trunk Line Overhead 500 171.35

Shin-Toyosu Line Underground 500 39.50

***Partially designed for 1,000 kV transmission

Shin-Noda Chiba Pref. 500 8,020

Shin-Sakado Saitama Pref. 500 6,900

Shin-Keiyo Chiba Pref. 500 6,750

Boso Chiba Pref. 500 6,690

Shin-Fuji Shizuoka Pref. 500 6,650

Major Facilities 10

Major Facilities

As of March 31, 2013

Hydroelectric Power

(with a capacity of more than 500 MW)

Generation Facilities

Station Name Location Output Type

(MW)

Thermal Power

(with a capacity of more than 1,000MW)

Station Name Location Output Fuel

(MW)

Nuclear Power

Station Name Location Output Reactor type

(MW)

Supply Facilities

Transmission Facilities

(with a capacity of more than 500 kV)

Line Name Type Voltage Length

(kV) (km)

Substation Name Location Maximum Voltage Output

(kV) (Thousand kVA)

Substation Facilities

Tokyo Electric Power Company

** Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake, which struck on March 11, 2011, the operations of all the units in Fukushima Daiichi, Fukushima Daini and Kashiwazaki-Kariwa Nuclear Power Stations have been suspended.

参照

関連したドキュメント

Comparison of strain rates during the historical (1880s-1990s) and GPS periods over northeastern Honshu before the 2011 Tohoku-Oki

< Academic Research > The Post-seismic Seafloor Deformation Following the 2011 Tohoku-oki Great Earthquake / Collaboration between Tsunami Engineering and

Abstract: University of Tsukuba, which has main campus at Tsukuba City in Ibaraki, was struck by Tohoku Region Pacific Coast Earthquake that occurred on March 11, 2011..

Off the Pacific coast of Tohoku Earthquake and subsequent Fukushima nuclear accident attacked Japan on March 11, 2011. The complex disaster with an earthquake, tsunami

In response to the Fukushima Daiichi Nuclear Power Plant accident that resulted from the East Japan Earthquake on March 11, 2011, the Tokyo Electric Power Company

C.: Shallow dynamic overshoot and energetic deep rupture in the 2011 M w 9.0 Tohoku Oki Earthquake,

Following the accidents at the Fukushima Daiichi nuclear power plant as a result of the March 2011 earthquake and subsequent tsunami disaster, the potential impact of such

Geomorphologic and Geologic Features of Landslides Induced by the 2011 Off the Pacific Coast of Tohoku Earthquake, in Shirakawa Hills, Fukushima Prefecture., Earthquake