Major FacilitiesAs of March 31, 2015

N/A
N/A
Protected

Academic year: 2022

シェア "Major FacilitiesAs of March 31, 2015"

Copied!
1
0
0

読み込み中.... (全文を見る)

全文

(1)

Imaichi Tochigi Pref. 1,050 Dam and conduit*

Shiobara Tochigi Pref. 900 Dam and conduit*

Tambara Gunma Pref. 1,200 Dam and conduit*

Kannagawa Gunma Pref. 940 Dam and conduit*

Kazunogawa Yamanashi Pref. 1,200 Dam and conduit*

Azumi Nagano Pref. 623 Dam and conduit*

Shin-Takasegawa Nagano Pref. 1,280 Dam and conduit*

Total hydroelectric power output (All facilities) 9,856

*Pumped storage

Ohi Tokyo 1,050 Crude oil

Shinagawa Tokyo 1,140 City gas

Yokosuka Kanagawa Pref. 2,274 Heavy oil, crude oil, light oil and city gas

Kawasaki Kanagawa Pref. 2,000 LNG

Yokohama Kanagawa Pref. 3,325 LNG, heavy oil, crude oil and NGL Minami-Yokohama Kanagawa Pref. 1,150 LNG

Higashi-Ohgishima Kanagawa Pref. 2,000 LNG

Chiba Chiba Pref. 4,380 LNG

Goi Chiba Pref. 1,886 LNG

Anegasaki Chiba Pref. 3,600 LNG, heavy oil, crude oil, LPG and NGL

Sodegaura Chiba Pref. 3,600 LNG

Futtsu Chiba Pref. 5,040 LNG

Kashima Ibaraki Pref. 5,660 Heavy oil, crude oil and city gas Hitachinaka Ibaraki Pref. 2,000 Coal

Hirono Fukushima Pref. 4,400 Heavy oil, crude oil and coal Total thermal power output (All facilities) 43,555

Fukushima Daini Fukushima Pref. 4,400 BWR Kashiwazaki-Kariwa Niigata Pref. 8,212 BWR, ABWR Total nuclear power output (All facilities)** 12,612

Nishi-Gunma Trunk Line Overhead 500*** 167.99

Minami-Niigata Trunk Line Overhead 500*** 110.77

Minami-Iwaki Trunk Line Overhead 500*** 195.40

Fukushima Trunk Line Overhead 500 181.64

Fukushima Higashi Trunk Line Overhead 500 171.35

Shin-Toyosu Line Underground 500 39.50

***Partially designed for 1,000 kV transmission

Shin-Noda Chiba Pref. 500 8,020

Shin-Sakado Saitama Pref. 500 6,900

Shin-Keiyo Chiba Pref. 500 6,750

Boso Chiba Pref. 500 6,690

Shin-Fuji Shizuoka Pref. 500 6,650

Major Facilities 12

Major Facilities

As of March 31, 2015

Hydroelectric Power

(with a capacity of more than 500 MW)

Generation Facilities

Station Name Location Output Type

(MW)

Thermal Power

(with a capacity of more than 1,000 MW)

Station Name Location Output Fuel

(MW)

Nuclear Power

Station Name Location Output Reactor type

(MW)

Supply Facilities

Transmission Facilities

(with a capacity of more than 500 kV)

Line Name Type Voltage Length

(kV) (km)

Substation Name Location Maximum Voltage Output

(kV) (Thousand kVA)

Substation Facilities

Tokyo Electric Power Company

** Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake, which struck on March 11, 2011, the operations of all the units in Fukushima Daini and Kashiwazaki-Kariwa Nuclear Power Stations have been suspended.

参照

関連したドキュメント

(11) Report on the results of the earthquake response analysis of the reactor building, facilities and pipes important to earthquake safety in Unit 1 at Fukushima Daini Nuclear

In order to provide for compensation payments for nuclear damages concerning the accident of Fukushima Daiichi Nuclear Power station damaged by the Tohoku-Chihou-Taiheiyou-Oki

Amount of Remuneration, etc. The Company does not pay to Directors who concurrently serve as Executive Officer the remuneration paid to Directors. Therefore, “Number of Persons”

(5) As explained in Note 17 to the accompanying consolidated financial statements, expenses and/or losses for scrapping Fukushima Nuclear Power Station Units 1 through 4

○ There was no wind pressure but we heard a sound like a balloon popping. Then everything went white and after little bit I heard a sound like pitter patter and I thought that

* Fukushima Daiichi NPS: 20 personnel, Fukushima Daini NPS: 20 personnel, Kashiwazaki-Kariwa NPS: 20 personnel Breakdown of the personnel already located (200 personnel) as of

Right: Workers experiencing hanging from safety belts Having learned much from responding to the Fukushima Nuclear Accident, the Niigata Chuetsu-Oki Earthquake, equipment trouble

Fukushima Daiichi Unit 5 was restored and achieved cold shutdown by getting access to power from the emergency DG of Unit 6 and installing a temporary underwater pump to replace