8/17/2017 1 www.onsemi.com

Test Procedure for the NCV7535V5C450GEVB Evaluation Board

Oscilloscope

1 2 3 4 Dig

+ -

Power Supply

A V

4R7 25W

USB PC

V V

Figure 1: Test Setup Configuration

(2)

8/17/2017 2 www.onsemi.com Required Equipment

 Oscilloscope

 Bench Power Supply, current capability min. 3 A, Ampermeter

 Voltmeter (alternatively free oscilloscope channel)

 PC Software for NCV7535 EVB Control

 Mini USB Cable

 NCV7535 Evaluation Board

Test procedure Step 1 (Standalone mode):

1. Set SW_SA switch to Standalone mode 2. Turn Pot1 left

3. Connect supply 4. Check IBAT

5. Check OUT1/2 state 6. Check VCHP

7. Check Vsen voltage 8. Turn Pot1 right 9. Check OUT1/2 state

Table 1: Desired Results IBAT = IBAT

OUT1/2 = PWM duty-cycle per Pot1 position VCHP = VCHP

Vsen = Vsen_off (when duty-cycle 0%) Vsen = Vsen_on (when duty-cycle 100%)

Test procedure Step 2 (PC Mode, HS1 + LS2 on):

1. Set SW_SA switch to PC mode 2. Connect USB

3. Start NCV7535 Control Software 4. Set software:

a. Check PWM ON

b. Check Motor-Control -> Forward

c. Check Motor-Control -> HS/LS Freewheeling 5. Move Duty slider

6. Check OUT1/2 state Table 2: Desired Results

OUT1/2 = PWM duty-cycle per Duty slider position

(3)

8/17/2017 3 www.onsemi.com Test procedure Step 4 (PC Mode, HS2 + LS1 on):

1. Set software:

a. Check PWM ON

b. Check Motor-Control -> Reverse

c. Check Motor-Control -> HS/LS Freewheeling 2. Move Duty slider

3. Check OUT1/2 state

Table 3: Desired Results

OUT1/2 = PWM duty-cycle per Duty slider position

DC Characteristics

MIN TYP MAX

VCC ON 4.9 V 5 V 5.1 V

IBAT (H-bridge off)

VCHP, Active mode VBAT + 8 V VBAT + 10 V VBAT + 12 V

OUTx LS 0.1 V

OUTx HS VBAT – 0.1 V

Vsen_off 40 mV 200 mV 360 mV

Vsen_on 550 mV 710 mV 870 mV

参照

関連したドキュメント

<6> MIN2 Read/Write When the ADM1027 is in automatic fan speed control mode, this bit defines whether PWM 2 is off (0% duty cycle) or at PWM 2 minimum duty cycle when

Figure 4: Comparison of Efficiency for Standard in-house and ONS321G Boards 7.1 (b) Efficiency Comparison of ONS321G Evaluation Board for V drvr = 5V & 10V**. Figure 5:

Connect the mating connector for the output voltage (J2) to the EVB and the other end to an electronic load capable of sinking at least 40 A, which is greater than the typical

- Write demanded value to relevant box and press Enter (in this case Voltage amplitude 20 and frequency 1, current with amplitude almost 1A and frequency 1Hz after motor start

Set APA parameter that is suitable for your battery. Refer datasheet about typical APA. The applied APA value is selected by the design capacity of your battery and Battery

“VAC_CONNECTOR”. 6) The digital power meter is connected at the input with the current meter in series with the supply and voltage meter across the input terminals as shown in

After the power supply is applied, FlexRay communication should be automatically initialized, what should be signaled by blinking LED1 on both nodes..

- Input current should be sinusoidal without distortion (refer to Ch4 shown in Figure 2), which is measured by oscilloscope.. Use 15 V dc source applied to TB3 to enable