• 検索結果がありません。

7

200 300

9.11 PP PP 12mm

43 m 0.91g/cm3 100MPa

AS AG AL 3 PP 0.2vol

2 6 RABT30 9.1

2

9.11

PP vol%

AS AG AL

100MPa 0 RABT30 100AS 100AG 100AL

9.12

PP PP

100 AS

100 AG

100 AL

100 ASP

100 AGP

100 ALP

(min)

1 4.3 3.1 3.6 4.3 3.7 3.9 2 4.7 3.8 3.7 3.8 3.5 3.3

1 4.5 3.5 3.6 4.1 3.6 3.6

2 3.9 3.8

(min)

1 11.9 9.0 14.4 5.8 5.1 5.3 2 6.9 12.1 13.7 6.5 4.4 4.7 1 9.4 10.5 14.0 6.2 4.7 5.0

2 11.3 5.3

(min)

1 7.6 5.9 10.8 1.5 1.3 1.4 2 2.3 8.2 10.0 2.7 1.0 1.5

1 4.9 7.0 10.4 2.1 1.2 1.4

2 7.4 1.6

(mm)

1 17.0 33.0 74.0 14.0 13.0 16.0 2 15.0 51.0 81.0 13.0 4.0 15.0 1 16.0 42.0 77.5 13.5 8.5 15.5

2 45.2 12.5

(mm)

1 5.5 9.0 29.0 3.4 3.0 5.0 2 2.8 21.0 27.0 3.6 0.4 4.0

1 4.2 15.0 28.0 3.5 1.7 4.5

2 15.7 3.2

9.23 0

2 4 6 8 10 12 14 16

100ASP 100AGP 100ALP 100P 100AS 100AG 100AL 100

0 10 20 30 40 50 60 70 80 90

100ASP 100AGP 100ALP 100P 100AS 100AG 100AL 100

9.13 100AS

100 AS-1

100 AS-2

100 ASP-1

100 ASP-2

9.14 100AG

100 AG-1

100 AG-2

100 AGP-1

100 AGP-2

9.15 100AL

100 AL-1

100 AL-2

100 ALP-1

100 ALP-2

9.24 9.29 5 10 25 40mm

PP 4 5 5 10mm

5

10mm 25mm 25mm

PP 200

9.24 100AS

9.25 100ASP

9.26 100AG 9.27

100AGP

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AS-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AS-2

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100ASP-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100ASP-2

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AG-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-1

C-5 C-10

C-25 C-40

9.28

100AL 9.29

100ALP

9.30 9.35 5 10 25 40mm

PP 4MPa

9.30 100AS

9.31 100ASP

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AL-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-1

C-5 C-10

C-25 C-40

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min

100AS-1

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 4 8 12 16

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100AS-2

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 5 10 15 20 25 30

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100ASP-1

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 5 10 15 20

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100ASP-2

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 5 10 15 20

9.32 100AG 9.33

100AGP

9.34

100AL 9.35

100ALP

9.36 9.41 5 10 25 40mm

10

10MPa PP

100AS PP

PP 100AG

100AL PP

9.36 100AS

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100AG-1

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 4 8 12 16

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100AGP-1

P5 P10 P25

P40

0 8 16 24 32 40

0 2 4 6 8 10

0 5 10 15 20

0 16 32 48 64 80

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100AL-1

P5 P10 P25

P40

0 20 40 60 80

0 2 4 6 8

0 2 4 6 8 10 12 14 16

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 100ALP-1

P5 P10 P25

P40

0 8 16 24 32 40

0 2 4 6 8 10

0 5 10 15 20

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AS-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AS-2

r-5 r-10

r-25 r-40

9.37 100ASP

9.38 100AG

9.39 100AGP

9.40 100AL

9.41 100ALP

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ASP-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ASP-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AG-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AG-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AL-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AL-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-2

r-5 r-10

r-25 r-40

9.42 9.47

4

0.3 100

100MPa PP

PP PP

PP

9.22

PP

9.42 100AS

9.43 100ASP

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100AS-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100AS-2

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100ASP-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100ASP-2

9.44 100AG

9.45 100AGP

9.46 100AL

9.47 100ALP

0 10 20 30 40 50 60

0 2 4 6 8 10 12 14 16 18 20 min

100AG-1

0 10 20 30 40 50 60

0 2 4 6 8 10 12 14 16 18 20 min

100AG-2

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100AGP-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

100AGP-2

0 20 40 60 80 100

0 2 4 6 8 10 12 14 16 18 20 min

100AL-1

0 20 40 60 80 100

0 2 4 6 8 10 12 14 16 18 20 min

100AL-2

0 10 20 30 40

0 2 4 6 8 10 12 14 16 18 20 min

100ALP-1

0 10 20 30 40

0 2 4 6 8 10 12 14 16 18 20 min

100ALP-1

PP

PP

1 3 5 PP 0.2vol%

PP

100AL PP 77.5mm 15.5mm

2 PP 4 5 5 10mm

5 10mm

PP 200

3 PP 4MPa

4 4

0.3 100

100MPa PP

5 PP

PP

9.22

9.16

AS AL 2

RABT30 9.1 RABT30 ISO834

60 9.2 2 4

AS 5

2

9.16 PP

vol% AS AL

70MPa

0 RABT30 70AS 70AL

0 RABT30 70AS-D

0 ISO60 70AS-I 70AL-I

*

RABT30 RABT30 2

30

ISO60 ISO834 3

60

**

105

9.17 9.48 9.18 9.20

RABT30 70AS 70AL

4 70AS

16.5mm 70AL 27mm ISO60 70AL-I-2

3 70AL-I-2

10.5 RABT30 6

18mm RABT30 9mm

3

1 2mm AS-D

9.17

70AS 70AS-D 70AL 70ASI 70ALI

(min)

1 4.5 3.8 0.0

2 3.7 3.8 10.5

4.1 3.8 5.3

(min)

1 7.5 8.0 0.0

2 7.2 8.3 18.2

7.3 8.2 9.1

(min)

1 3.0 4.3 0.0

2 3.5 4.6 7.7

3.3 4.4 3.8

(mm)

1 13.0 27.0 2.0 1.0

2 20.0 28.0 1.0 20.0

16.5 27.5 1.5 10.5

(mm)

1 4.8 11.2 0.1 0.02

2 5.6 8.6 0.1 5.0

5.2 9.9 0.1 2.5

9.48 0

1 2 3 4 5 6 7 8 9 10

70AS 70AS-D 70AL 70ASI 70ALI

0 5 10 15 20 25 30

70AS 70AS-D 70AL 70ASI 70ALI

9.18

70 AS-1

70 AS-2

70 AS-I-1

70 AS-I-2

9.19

70 AL-1

70 AL-2

70 AL-I-1

70 AL-I-2

9.20

70 AS-D-1

70 AS-D-2

9.49 9.53 5 10 25 40mm

RABT30 70AS 70AL 4 5 5 10mm

5 10mm 70AL

25mm 25mm 7

ISO60

10.5 70AL-I-2 10 17 5 10mm

200

9.49 70AS

9.50 70AS-I

9.51 70AS-D

9.52 70AL

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AS-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AS-2

C-5 C-10

C-25 C-40

0 100 200 300 400 500 600 700 800

0 10 20 30 40 50 60

min 70AS-I-1

C-5 C-10

C-25 C-40

0 100 200 300 400 500 600 700 800

0 10 20 30 40 50 60

min 70AS-I-2

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AS-D-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AS-D-2

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AL-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 70AL-2

C-5 C-10

C-25 C-40

9.53 70AL-I

9.54 9.57 5 10 25 40mm

1 10MPa RABT30

ISO60

70AL-I-1 5mm 7MPa

70AL-I-2 25mm 0.6MPa 20mm

70AL-1

9.54 70AS

0 100 200 300 400 500 600 700 800

0 10 20 30 40 50 60

min 70AL-I-1

C-5 C-10

C-25 C-40

0 100 200 300 400 500 600 700 800

0 10 20 30 40 50 60

min 70AL-I-2

C-5 C-10

C-25 C-40

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60 70

min 70AS-1

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AS-2

P-5 P-10 P-25

P-40

9.55 70AS-I

9.56 70AL

9.57 70AL-I

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AS-I-1

P-5 P-10 P-25 P-40

0 2 4 6 8 10

0 10 20 30 40 50 60

min

70AS-I-2

P-5 P-10 P-25 P-40

0.0 0.2 0.4 0.6 0.8 1.0 1.2

0 10 20 30 40 50 60

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AL-1

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AL-2

P-5 P-10 P-25

P-40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AL-I-1

P-5 P-10 P-25 P-40

0 8 16 24 32 40

0 2 4 6 8 10

0 10 20 30 40 50 60

min 70AL-I-2

P-5 P-10 P-25

P-40

0 8 16 24 32 40

0.0 0.2 0.4 0.6 0.8 1.0

0 10 20 30 40 50 60

9.58 9.62 10 25 40mm

RABT30

10 ISO60 25 10MPa

ISO60 RABT30

70ALI-2 70AS-D

9.58 70AS

9.59 70AS-I

9.60 70AL

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min

70AS-1

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min

70AS-2

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 5 10 15 20 25 30

min

70ASI-1

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 5 10 15 20 25 30

min 70ASI-2

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min

70AL-1

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min

70AL-2

r-10 r-25 r-40

9.61 70AL-I

9.62 70AS-D

9.63 9.67

RABT30 70AS 70AL

ISO60 70AS-I 70AL-I 70AL-I-2

10mm 15

70AL-I-2 10mm 16

ISO60 RABT30

RABT30 ISO60

70AS-D 8

10 25mm

3.5 0

2 4 6 8 10 12 14

0 5 10 15 20 25 30

min

70ALI-1

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 5 10 15 20 25 30

min

70ALI-2

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 70ASD-1

r-10 r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 70ASD-2

r-10 r-25 r-40

9.63 70AS

9.64 70AS-I

9.65 70AL

9.66 70AL-I

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-2

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-I-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-I-2

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AL-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AL-2

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AL-I-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AL-I-2

9.67 70AS-D

1 ISO60 RABT30

2 200

3

4 ISO60 RABT30

RABT30 ISO60

5

8 10 25mm

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-D-1

0 5 10 15 20 25 30 35 40

0 2 4 6 8 10 12 14 16 18 20 min

70AS-D-2

PP

1 ISO60 RABT30

2 RABT30 3

5 ISO60 10

PP 200

3 PP

PP

4

5 PP

4MPa

6 AS

7 4

0.3 100

70 100MPa PP

8

200 300

[1] pp.98-108 2009.3.

[2] ZTV-TUNNEL Zusaetzliche Technische Vertragasbed-ingungen und Richtlinien fuer den Bau von Strassentunneln Teil 1 Geschlossene Bauweise, Bundesministerium fuer Verkehr, 1995.

[3] ISO 834-1 1999 Fire resistance tests Elements of building construction Part1 General requirements, International Organization for Standardization.

[4] pp.63-65 2009.3.

[5] vol.22 No.3 1984.3.

RC

1 5

PP 6 12

RC

PP

PP

6 11 12

PP

13

2

10.1

PP 3 AG AL 2

6

10.1

MPa

PP

vol% mm

AG AL

100 0 RABT30 0 100AG 100AL

PP 100 0.2 RABT30 0 100AGP 100ALP

(FP) 100 0 RABT30 30 100AGFP 100ALFP

1 10.1

300 50 8mm 2

300 100 8mm

5mm 2mm 5 10 25 40mm 4

80

5 10 25 40mm 2 8

2

2 10.1

200 200mm 30mm

10.1

300 284 200 200 30mm

300

50 50

mm 30 200

2 PP 2 4

10.2 10.3

10.4

100 200mm 50 100mm

20

10.2

NO. W/C kg m3

W C S2 S3 G3 G4 SP.1 PPF

100AG

0.3 150 500 358 372

1169 9.5

100AGP 10.5 1.82

100AL

1095 7.5

100ALP 10.0 1.82

10.3

C 3.15g/cm3

S2 1.06% 2.60 g/cm3

S3 1.93% 2.68 g/cm3

G3 0.81% 2.68 g/cm3

G4 2005 0.94% 2.83 g/cm3

SP.1

PPF 12mm 43 m 0.91g/cm3

10.4 NO. %

SL*

(cm)

Tc**

(MPa) (GPa) (MPa) (%) 100AG 0.9 17.5 25.8 93.3 58.6 6.9 3.1 100AGP 0.8 20.0 27.5 102.9 52.6 7.4 3.3

100AL 1.1 16.0 26.0 94.8 50.1 6.0 3.2 100ALP 0.9 20.0 26.4 87.5 52.4 6.8 3.4

* **)

SBR

30mm 10.1 200 200mm

10.1 10.4 10.5

10.5

30mm 200×200mm

1.6mm @50mm SBR

1.5MPa

0.55 0.85g/cm3 0.97kJ/(kg K) 0.14 0.30W/(m K) 6.0%

10.1 10.2

10.3 10.4

RABT30 14 5.5

1

20mm

2

10.1 2 K

5 10 25 40mm

4 2 5 10 25

40mm 8

3

80

10.1 2

5 10 25 40mm 8 -10.1

( -10.1)( -6.5)

4

5 10 25 40mm

5mm 2mm 10MPa

5

-10.2 -10.5

f -10.5 1

7.19 15 0.30

-f 100

( -10.2)( -7.2) ( -10.3)( -7.3) ( -10.4)( -7.4) ( -10.5)( -7.5)

10.6 10.2 10.7 10.9

PP 10 15mm

42 75mm

10.6

PP

100AG 100AL 100AGP 100ALP 100AGFP 100ALFP

(min)

1 3.1 3.6 3.7 3.9 2 3.8 3.7 3.5 3.3 3.5 3.6 3.6 3.6

(min)

1 9.0 14.4 5.1 5.3 2 12.1 13.7 4.4 4.7

10.5 14.0 4.7 5.0

(min)

1 5.9 10.8 1.3 1.4 2 8.2 10.0 1.0 1.5 7.0 10.4 1.2 1.4

(mm)

1 33.0 74.0 13.0 16.0 2 51.0 81.0 4.0 15.0

42.0 77.5 8.5 15.5

(mm)

1 9.0 29.0 3.0 5.0 2 21.0 27.0 0.4 4.0

15.0 28.0 1.7 4.5

10.2 0

2 4 6 8 10 12 14 16

100AG 100AL 100AGP

100ALP 100AGFP 100ALFP

0 10 20 30 40 50 60 70 80 90

100AG 100AL 100AGP

100ALP 100AGFP 100ALFP

10.7

100 AG-1

100 AG-2

100 AL-1

100 AL-2

10.8 PP

100 AGP-1

100 AGP-2

100 ALP-1

100 ALP-2

10.9

100 AGFP-1

100 AGFP-2

100 ALFP-1

100 ALFP-2

10.3 10.8 5 10 25 40mm

PP 4 5 5 10mm

5 10mm

100

10.3 100AG 10.4 100AL

10.5 100AGP 10.6 100ALP

10.7 100AGFP 10.8 100ALFP

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AG-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AL-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-1

C-5 C-10

C-25 C-40

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100AGFP-1

C-5 C-10

C-25 C-40

0 50 100 150 200

0 50 100 150

0 200 400 600 800 1000 1200

0 1 2 3 4 5 6 7 8 9 10

min 100ALFP-1

C-5 C-10

C-25 C-40

0 50 100 150 200

0 50 100 150

10.9 10.14 5 10 25 40mm

PP

100

10.9

100AG

10.10

100AGP

10.11

100AL

10.12

100ALP

10.13

100AGFP

10.14

100ALFP

0 10 20 30 40 50

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100AG-1

P-5 P-10 P-25

P-40

0 10 20 30 40 50

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100AGP-1

P5 P10 P25

P40

0 20 40 60 80 100

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100AL-1

P5 P10 P25

P40

0 10 20 30 40 50

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100ALP-1

P5 P10 P25

P40

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100AGFP-1

P5 P10 P25 P40

0 2 4 6 8 10

0 5 10 15 20 25 30

min 100ALFP-1

P5 P10 P25 P40

10.15 10.20 5 10 25 40mm

10 6 10MPa 100AL

100

10.15 100AG

10.16 100AGP

10.17 100AGFP

10.18 100AL

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AG-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AG-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGP-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGFP-1

r5 r10

r25 r40

0.0 0.5 1.0 1.5 2.0

0 5 10 15 20 25 30

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AGFP-2

r5 r10

r25 r40

0.0 0.5 1.0 1.5 2.0

0 5 10 15 20 25 30

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AL-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100AL-2

r-5 r-10

r-25 r-40

10.19 100ALP

10.20 100ALFP

PP 10.21

10.26

PP 2

30

10.21 100AG

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-1

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALP-2

r-5 r-10

r-25 r-40

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALFP-1

r5 r10

r25 r40

0.0 0.5 1.0 1.5 2.0

0 5 10 15 20 25 30

0 2 4 6 8 10 12 14

0 1 2 3 4 5 6 7 8 9 10

min 100ALFP-2

r5 r10

r25 r40

0.0 0.5 1.0 1.5 2.0

0 5 10 15 20 25 30

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min

100AG-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min 100AG-2

5mm 10mm

25mm 40mm

10.22 100AGP

10.23 100AGFP

10.24 100AL

10.25 100ALP

10.26 100ALFP

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min

100AGP-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min

100AGP-2

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 5 10 15 20 25 30

min 100AGFP-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 5 10 15 20 25 30

min 100AGFP-2

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10

min 100AL-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min 100AL-2

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min

100ALP-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 2 4 6 8 10 12 14 16

min

100ALP-2

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 5 10 15 20 25 30

min 100ALFP-1

5mm 10mm

25mm 40mm

0.0 0.2 0.4 0.6 0.8 1.0

0 5 10 15 20 25 30

min 100ALFP-2

5mm 10mm

25mm 40mm

PP

1 PP 10 15mm

42 75mm

2 PP 4 5 5 10mm

5 10mm 100

3 PP

100

4 PP 2

30

[1]

Vol. 19 No. 1 pp. 631 636 1997.

[2]

145 pp. 45 55 2003 .

[3] RC

Vol. 24 No. 1 pp. 1719 1724 2002.

[4] CONCRETE JOURNAL

Vol. 45 No. 9 pp. 111 114 2007.

[5]

pp. 405 406 2005.

[6] Zeiml, M, Leithner, D, Lackner, R, Mang, H.A. How do polypropylene fibers improve the spalling behavior of in-situ concrete? Cement and Concrete Research 36, pp.929 942, 2006.

[7] Khoury, G. A., Willoughby, B. : Polypropylene fibres in heated concrete. Part 1 : Molecular structure and materials behavior, Magazine of Concrete Research, 60, No. 2, pp.125 136, 2008.

[8] Kalifa, P., Chéné, G., Gallé, C. : High-temperature behaviour of HPC with polypropylene fibres From spalling to microstructure, Cement and Concrete Research 31, pp.1487 1499, 2001.

[9]

No. 544 pp.171 178 2001.

[10]

Vol.30 No.1 pp.339 344 CD-ROM 2008.

[11] Watanabe, K., Mugume, R.B., Horiguchi, T. : Effect of elevated temperatures on flexural behaviour of hybrid fibre reinforced high strength concrete, Journal of Structural Fire Engineering, Vol. 1, No. 1, Multi - Science Publishing Co Ltd, pp.17 28, 2010.

[12]

Vol.34 No.1 pp.1126-1131 2012.

[13]

13 pp.495-500, 2013.11.

[14] ZTV-TUNNEL Zusaetzliche Technische Vertragasbed-ingungen und Richtlinien fuer den Bau von Strassentunneln Teil 1 Geschlossene Bauweise, Bundesministerium fuer Verkehr, 1995.

[15] pp.63-65 2009.3.

PP

PP

11.1 5

Connolly 1

2 4

RILEM Technical Committee 227 HPB 5 8

Connolly 1

11.2

11.1

1 RABT 9 ISO 10

2 3 4 5

11.2

300 8 50mm 2

80 0.05MPa

SA

11.1

11.1

I-f z t-f

I-lim 1

I

-f

I

-lim

YES

NO

NO YES

100MPa HSC 200MPa UFC

UFC

30 30

1mm

PP

200 300

PP

PP

PP 2

30

6 11

11.3

11.3 11

Aggregate spalling

Aggregate spalling Surface

spalling Aggregate spalling

Corner spalling

Surface spalling

Corner spalling

Surface spalling

Surface spalling

Explosive spalling

3

Explosive spalling

Sloughing off

spalling Corner spalling

Sloughing off spalling

Post cooling spalling

Corner spalling Sloughing off spalling

Post cooling spalling

1

2

1

2

6 11

[1] Connolly R.J. The spalling of concrete in Fires PhD thesis submitted to Aston University 1995.

[2]

226 pp. 67-72 1974.6.

[3]

No. 478/ -21 pp. 91-100 1993.11.

[4]

Vol. 33 No. 1 pp. 437-442 2011.

[5] Schneider, U. M. C. Alonso, P. Pimienta, R. Jansson : Physical properties and behaviour of high-performance concrete at high temperatures, Proceeding of Sixth Inter-national Conference on Structures in Fire., USA, Michigan, pp. 800 816, 2010.

[6] Jansson, R., L, Boström : The influence of pressure in the pore system on fire spalling of concrete, Fire Technology 46, No. 1, pp. 217 230, 2010.

[7] Ko, J., Ryu, D., Noguchi, T. : The spalling mechanism of high strength concrete under fire, Magazine of Concrete research, Vol. 63, No. 5, pp. 357 370, 2011.

[8] L.T. Phan, : Pore pressure and explosive spalling in concrete, Materials and Structures, Vol. 41, pp.

1623 1632, 2008.

[9] ZTV-TUNNEL Zusaetzliche Technische Vertragasbed-ingungen und Richtlinien fuer den Bau von Strassentunneln Teil 1 Geschlossene Bauweise, Bundesministerium fuer Verkehr, 1995.

[10] ISO 834-1 1999 Fire resistance tests Elements of building construction Part1 General requirements, International Organization for Standardization.

[11]

2012.5.

1

E2 Vol. 70 No. 1 pp.

104-117 2014

1’ Toru Tanibe, Mitsuo Ozawa, Ryota Kamata, Yuichi Uchida and Keitetsu Rokugo Development and Evaluation of a Model for Fire-Related HSC Spalling Failure Proceedings of The 8th International Conference on Structure in Fire, pp. 411-418, 11-13 June 2014, Shanghai, China.

2 Toru Tanibe, Mitsuo Ozawa, Ryota Kamata and Keitetsu Rokugo Steel Ring-Based Restraint of HSC Explosive Spalling in High Temperature Environments, JOURNAL OF STRUCTURAL FIRE ENGINERING, pp. 239-250, Vol.5, No.3, 2014.

2’ Toru Tanibe, Mitsuo Ozawa, Dantas Rafael Lustoza, Kouetsu Kikuchi, Hiroaki Morimoto Explosive Spalling Behavior of Restrained Concrete in The Event of Fire, Proceedings of the 2nd International RILEM Workshop on Concrete Spalling due to Fire Exposure, pp. 319-326, 5-7 October 2011, Delft, The Netherlands.

2” Toru Tanibe, Mitsuo Ozawa, Ryota Kamata and Keitetsu Rokugo Steel ring-based restraint of HSC explosive spalling in high-temperature environments, Proceedings of The 7th International Conference on Structure in Fire, pp. 737-745, 6-8 June 2012, Zurich, Switzerland.

2’”

Vol. 34 No. 1 pp. 1138-1143 2012.

3

Vol. 35 No. 1 pp.

1135-1140 2013.

3’ Toru Tanibe, Mitsuo Ozawa, Ryota Kamata, Ryoichi Sato and Keitetsu Rokugo Thermal stress estimation in relation to spalling of HSC restrained with steel rings at high temperatures, MATEC Web of Conferences 6, 01004 (2013).

4

Vol. 36 No. 1 pp.

1336-1341 2014

1

13 pp. 495-500 2013.11.

1’

Vol. 35 No. 1 pp. 1147-1152 2013.

2)

Vol. 35 No. 1 pp. 1141-1146 2013

1

66 pp. 155-156 2011.

2

1

pp. 1-2 2011.

3

2 pp. 3-4 2011.

4

67 pp. 355-356 2012

5

67 pp. 357-358 2012

6

1 pp.

195-196 2012.

7

2 pp.

197-198 2012.

8

67 pp. 276-277 2013.

9 RC

pp. 369-370 2013.

10

68 pp. 125-126

2013.

11

68 pp. 127-128 2013.

12

pp.

97-98 2013.

13

pp. 103-104 2013.

14

69 pp. 51-52

関連したドキュメント