• 検索結果がありません。

Attachment 2-3

N/A
N/A
Protected

Academic year: 2022

シェア "Attachment 2-3"

Copied!
4
0
0

読み込み中.... (全文を見る)

全文

(1)

Attachment 2-3-1

Attachment 2-3 Amounts of water injection assumed in MAAP analysis for Unit-2

[Condition for the water injection rate in the current MAAP analysis (Attachment 3)]

The amount of water injection by the reactor core isolation cooling system (RCIC) for the analysis was set at about its rated flow rate before the loss of all AC and DC power supplies.

After the loss of DC power, RCIC water injection rate was set larger than rated design value in order to simulate the increasing reactor water level recorded by process computer. After reactor water level reached main steam nozzles, RCIC water injection rate was set as 30t/h, about one third of rated design value, and two-phase flow was extracted for RCIC turbine with the energy corresponding to decay heat, in order to simulate the low reactor pressure transient. (Figure 1)

The water injection by fire engines as the input for the current analysis was assumed to start when fire engines were started up after the reactor depressurization by opening the safety relief valve (SRV). And during the core melt progression, it was assumed that water injection into the reactor was interrupted when reactor pressure exceeded 1.1 MPa[gage].

Finally, the reactor water level was assumed as unable to keep the level sufficient to cover the core region. Consequently, the water injection rate in the analysis was set so that the reactor water level stayed below the fuel region. And also the water injection rate was set so as not to exceed its daily average discharge flow rate from fire engines (Figure 2).

(2)

Attachment 2-3-2

0 20 40 60 80 100 120

3/11 12:00

3/12 0:00

3/12 12:00

3/13 0:00

3/13 12:00

3/14 0:00

3/14 12:00

3/15 0:00

3/15 12:00

3/16 0:00 Date / Time

RCIC water injection flow rate (t/h)

RCIC water injection flow rate (analysis input)

Before the loss of all AC power supplies After the loss of all AC/DC power supplies

Reactor water level reached MS nozzles

Figure 1 RCIC water injection flow rate

0 10 20 30 40 50 60 70 80 90 100

3/11 12:00

3/12 0:00

3/12 12:00

3/13 0:00

3/13 12:00

3/14 0:00

3/14 12:00

3/15 0:00

3/15 12:00

3/16 0:00

3/16 12:00

3/17 0:00

3/17 12:00

3/18 0:00

3/18 12:00 Date / Time

Alternative water injection flow rate (m3/h)

Water injection rate by fire engines (analysis input) Average discharge flow rate from fire engines

Figure 2 Water injection rate by fire engines

(3)

Attachment 2-3-3

[Condition for the water injection rate in the previous MAAP analysis reported in March 2012 (Separate Volume 1)]

The amount of water injection by the reactor core isolation cooling system (RCIC) for the analysis was set at about its rated flow rate before the loss of all AC power supplies and at about 30t/h after the loss of all AC power supplies so that the reactor pressures observed could be simulated (Figure 3).

The amounts of water injection into the reactor by fire engines has been set in the MAAP analysis for Unit-2 as not exceeding the daily average of water injection, based on the operation records made public so far and interrupting the injection when the reactor

pressure exceeded 1MPa[gage], because the discharge pressure of fire engines at that time was about 1MPa[gage] (Figure 4).

(4)

Attachment 2-3-4

0 10 20 30 40 50 60 70 80 90 100

3/11 12:00

3/12 0:00

3/12 12:00

3/13 0:00

3/13 12:00

3/14 0:00

3/14 12:00

3/15 0:00

3/15 12:00

3/16 0:00

3/16 12:00

3/17 0:00

3/17 12:00

3/18 0:00

3/18 12:00 日時

RCIC

注水流量

(t/h)

全交流電源喪失前

Figure 3 RCIC water injection flow rate

0 10 20 30 40 50 60 70 80 90 100

3/11 12:00

3/12 0:00

3/12 12:00

3/13 0:00

3/13 12:00

3/14 0:00

3/14 12:00

3/15 0:00

3/15 12:00

3/16 0:00

3/16 12:00

3/17 0:00

3/17 12:00

3/18 0:00

3/18 12:00 日時

代替注水流量

(m3 /h)

流量上限(原子炉注水実績)

原子炉注水量(解析)

実機の原子炉圧力から注水不能を 仮定している期間

・3/14 20:54~3/14 21:18

・3/14 22:50~3/14 23:40

・3/15 0:16~3/15 1:11

Figure 4 Water injection rate by fire engines Date / Time

Before the loss of all AC power supplies

RCIC water injection flow rate (t/h)

Date / Time Upper limit of flow rate (actual injection recorded)

Alternative water injection flow rate (m3 /h)

Water injection flow rate (analysis input)

Time period of no water injection assumed

・3/14 20:54~3/14 21:18

・3/14 22:50~3/14 23:40

・3/15 0:16~3/15 1:11

参照

関連したドキュメント

de Lima Santos, Asymptotic behavior of solutions to wave equations with a memory condition at the boundary, Electron.. Morro, A boundary condition with memory in

Moreover, to obtain the time-decay rate in L q norm of solutions in Theorem 1.1, we first find the Green’s matrix for the linear system using the Fourier transform and then obtain

The idea is that this series can now be used to define the exponential of large classes of mathematical objects: complex numbers, matrices, power series, operators?. For the

Pour tout type de poly` edre euclidien pair pos- sible, nous construisons (section 5.4) un complexe poly´ edral pair CAT( − 1), dont les cellules maximales sont de ce type, et dont

We show that some boundary value problems governed by a second order or- dinary differential equation admits solutions with slope in a known pre-specified region of the positive

The repeated homogeneous balance method is used to construct new exact traveling wave solutions of the (2+1) dimensional Zakharov- Kuznetsov (ZK) equation, in which the

In order to be able to apply the Cartan–K¨ ahler theorem to prove existence of solutions in the real-analytic category, one needs a stronger result than Proposition 2.3; one needs

The ending lamination conjecture says that freely indecomposable Kleinain groups would be completely determined up to conjugacy by the homeomorphism types of the