• 検索結果がありません。

写真 ワークショップでの調査報告発表 東京一組発表

N/A
N/A
Protected

Academic year: 2021

シェア "写真 ワークショップでの調査報告発表 東京一組発表"

Copied!
13
0
0

読み込み中.... (全文を見る)

全文

(1)

100

()2. “3rd Round Russia-Japan Seminar on Waste Management Exchange Experience”

101 写真

ワークショップでの調査報告発表

(2)

102  集合写真

(3)

102  集合写真

Clean Project Summary

103 AP R OV ED B y t he pr es id ium of the P re si den tial C ounc il o f t he Ru ss ia n Fed er at ion on S trat eg ic Dev el opm ent and P rior ity Pro jec ts ( Mi nut es o f D ec em ber 21, 2016 N .12 ) PA SS PO RT O f t he P rior ity pr oj ec t “ R ed uci ng the neg at iv e i m pac t o n t he env ironm ent thr oug h t he e lim inat ion o f ob jec ts ac cum ul at ed d am ag e t o t he e nv ironm ent and to r educ e sha re d ispos al o f so lid m uni ci pal w as te ” SU MM A RY N am e t rends Ecol og y Short nam e of pr oj ect “C lea n C ount ry ” St ar t d ate : 01 /01 /2017 End of p ro jec t: 12/ 31 /202 5 C ur at or A lexa nd er K hl opon in, D ep ut y Pri m e M in is ter Seni or O ffi ci al Me et ing (SO M) * Funct iona l cu st om er S.E .D onsk oy , Mi ni st er of N at ur al R es ou rce s a nd E col ogy of the Ru ss ian Fed er at io n Pro je ct Ma nag er M.K .K er im ov , D eput y Mi ni st er o f N at ur al R esour ce s a nd Ecol og y of the Russ ian Feder at ion K ey m em ber s of t he pr oj ec t Mi ni st ry of N at ur al R es our ce s and Eco lo gy of the R uss ian Fed er at ion, M ini st ry of Econom ic D ev el opm ent of the R uss ian Fed er at ion, the R uss ian Mi ni st ry of C on st ru ct ion, Mi ni str y of Indust ry and Tr ade of the R uss ian Feder at ion Mi ni st ry of E ner gy , t he Fed er al S er vi ce for Supe rv isi on o f N at ur al R es ou rce s, the St at e C or por at ion f or A ss is tan ce t o D ev el opm ent , Pro duc tion and expor t of hi gh -tec h pr oduc ts “Ro ste c” on b eha lf of th e aut hor iz ed or gani zat ion - O OO “RT -In ve st ”, t he hi ghes t ex ec ut iv e bod ies o f sub je ct s of the R uss ian Feder at ion, t he Mi ni st ry of C onst ruc tion, A rch itec tur e and H ous ing of the R epubl ic of T at ar st an, th e M ini st ry of Eco log y and N at ur al R epubl ic of T at ar st an res our ce s, th e Mi ni st ry of E col og y and N at ur e Ma nag em ent of t he Mos cow reg ion, r epr ese nt at iv es of pr of es si ona l, e xpe rt c om m uni ties , t he bus ine ss sec tor . Im pl em ent at io n o f t he func tion s of d epa rtm ent al p ro je ct of fice unde r t he Mi ni st ry of R uss ia O rder of 28.1 0.2 016, t he num ber 5 61 i s as si gned to the S ta te Or gan iz at io n “I nst itut e of E col og y” , subor di na ted to t he Mi ni st ry of R uss ia. *O pt io nal pos iti on a ppoi nt ed by the Boa rd o f t he Pr es idi um

(4)

104 C O N TEN TS O F P R IO R IT Y PR O JEC TS O bj ec tiv e o f t he p ro jec t R educ ing the neg at iv e im pac t o n t he env ironm ent due to the cons tru ct ion and op er at ion of the 5 ob jec ts on the th er m al tr ea tm en t of TCR (4 in the Mo sc ow reg ion and 1 i n t he R epubl ic o f T at ar st an ), w hi ch w ill a llow by 2023 to redu ce the v ol um e of p la ce m ent o f 7% fo r t he w ho le of th e R us si an Fede rat ion, to a chi ev e “z er o dum pi ng ” in K az an w ith the si m ul ta neous pr od uc tion of e le ct ric ity 2.6 8 bi lli on. k Wh pe r y ea r, a s w el l as r edu ci ng t he pr im ar y en vi ronm ent al r isk s as so ci at ed w ith t he ob je ct s of t he ac cum ul at ed env ironm ent al ha rm to t he env ironm ent , due to the el im inat ion o f 25 obj ec ts 20 R uss ian Fe der at ion, w hi ch wil l r es tor e t he e nd of 2 018 of 1 .04 thous and. h a, b y t he e nd o f 2025 - 1.45 thous and he ct ar es o f l and, im pr ov e the en vi ronm ent al c ondi tions of the popu la tion liv ing in t he am ount of 1.6 m illio n peopl e... by 2018 , 4 .3 m ill ion peop le -. bef or e t he e nd of 2025 . The pl an to ac hi ev e pr oj ec t i nd ic at or s Index Typ e of indi ca to r *B as el i ne Per io d y ea r 2017 2018 2019 2020 2021 2022 2023 2024 2025 Pri or ity w as te 1. The pr op or tion of di spo sa l o f so lid m uni ci pal w as te af ter th e int roduc tion o f tec hn ol og ie s of t hei r ther m al des truc tion, % /T hs. T on s (Mos cow reg ion) ma in 95 / 9500 95 / 9500 95 / 9500 95 / 9500 95 / 9500 90 / 9000 80 / 8000 65 / 6500 65 / 6500 65 / 6500 2. T he sha re of th e di spo sa l o f so lid m uni ci pal w as te af ter th e im pl em ent at io n of t hei r ther m al tec hnol og ie s ma in 93 / 59 1.48 93 / 591.4 8 93 / 591.4 8 93 / 591.4 8 93 / 591.4 8 80 / 508.8 5 / 31.8 5 / 31.8 5 / 31.8 0 neut ral iz at ion, % / T hs . T ons (K az an) Pri or ity ac cum ul at ed wa st e Index Ty pe indi ca to rs Bas el in e ** Per io d y ea r 2017 2018 2019 2020 2021 2022 2023 2024 2025

(5)

104 C O N TEN TS O F P R IO R IT Y PR O JEC TS O bj ec tiv e o f t he p ro jec t R educ ing the neg at iv e im pac t o n t he env ironm ent due to the cons tru ct ion and op er at ion of the 5 ob jec ts on the th er m al tr ea tm en t of TCR (4 in the Mo sc ow reg ion and 1 i n t he R epubl ic o f T at ar st an ), w hi ch w ill a llow by 2023 to redu ce the v ol um e of p la ce m ent o f 7% fo r t he w ho le of th e R us si an Fede rat ion, to a chi ev e “z er o dum pi ng ” in K az an w ith the si m ul ta neous pr od uc tion of e le ct ric ity 2.6 8 bi lli on. k Wh pe r y ea r, a s w el l as r edu ci ng t he pr im ar y en vi ronm ent al r isk s as so ci at ed w ith t he ob je ct s of t he ac cum ul at ed env ironm ent al ha rm to t he env ironm ent , due to the el im inat ion o f 25 obj ec ts 20 R uss ian Fe der at ion, w hi ch wil l r es tor e t he e nd of 2 018 of 1 .04 thous and. h a, b y t he e nd o f 2025 - 1.45 thous and he ct ar es o f l and, im pr ov e the en vi ronm ent al c ondi tions of the popu la tion liv ing in t he am ount of 1.6 m illio n peopl e... by 2018 , 4 .3 m ill ion peop le -. bef or e t he e nd of 2025 . The pl an to ac hi ev e pr oj ec t i nd ic at or s Index Typ e of indi ca to r *B as el i ne Per io d y ea r 2017 2018 2019 2020 2021 2022 2023 2024 2025 Pri or ity w as te 1. The pr op or tion of di spo sa l o f so lid m uni ci pal w as te af ter th e int roduc tion o f tec hn ol og ie s of t hei r ther m al des truc tion, % /T hs. T on s (Mos cow reg ion) ma in 95 / 9500 95 / 9500 95 / 9500 95 / 9500 95 / 9500 90 / 9000 80 / 8000 65 / 6500 65 / 6500 65 / 6500 2. T he sha re of th e di spo sa l o f so lid m uni ci pal w as te af ter th e im pl em ent at io n of t hei r ther m al tec hnol og ie s ma in 93 / 59 1.48 93 / 591.4 8 93 / 591.4 8 93 / 591.4 8 93 / 591.4 8 80 / 508.8 5 / 31.8 5 / 31.8 5 / 31.8 0 neut ral iz at ion, % / T hs . T ons (K az an) Pri or ity ac cum ul at ed wa st e Index Ty pe indi ca to rs Bas el in e ** Per io d y ea r 2017 2018 2019 2020 2021 2022 2023 2024 2025 105 1. The num ber of p eopl e w hose qua lit y of li fe w ill im pr ov e in co nnec tion w ith t he liqui dat ion a nd rec lam at ion of ob jec ts ac cum ul at ed env ironm ent al ha rm t o the env ironm ent , t h. Peopl e. ma in 4321 104 1570 2364 3800 4168 4321 4321 4321 43 21 2. The t ot al a rea of t he res tor ed, i ncl udi ng rec lai m ed la nd sub je ct to the adv er se ef fe ct s of ac cum ul at ed env ironm ent al dam ag e, thous. ha ma in 1.45 0.01 1.04 1.1 1 1.40 1.43 1.45 1.45 1.45 1.45 * t he b as e v al ue o f t he i nde x at the repo rti ng dat e (e nd of 2016 ) ** B as e v al ue of th e i ndex at the r epo rti ng dat e (en d of 2016 ) f or the de fin ed pa ra m et er s a s f ol low s: in t er m s of 1 - t he num ber of peop le w hose qu al ity of li fe is br ok en due to t he pr es enc e of ob jec ts ac cum ul at ed env iro nm ent al ha rm to the env iro nm ent , t hous an d per s. in t er m s of 2 - to ta l a re a o f di st ur bed l ands , t ho usa nd h a.. The v al ue o f i ndi ca tor s pr es ent ed on an ac cr ua l ba si s. S ince 2020 the v al ue of ind ic at or s wi ll be de te rm ined ba se d on the am ount of fi nanc ial suppo rt. pr oj ec t r es ult s Pr ior ity “Wa st e” : 1. C rea ting env ironm ent al ly fr ien dl y pr od uct ion fa ci lit ies fo r di spos al of sol id m uni ci pa l w as te fr om pow er g ene rat ion in the am ount of 2.68 bi lli on k Wh pe r y ea r. 2. Th e int roduc tion of in te rnat iona l be st p ra ct ice s ( “ bes t av ai la bl e te chno log ies ”) , ai m ed at the env ironm ent al ly soun d m ana ge m ent of w as te. 3. The im pl em ent at ion o f t he pi lot pr oj ect (4 p lan t f or the the rm al tr eat m ent o f T CR in t he M osc ow reg ion an d one f ac tor y i n the ci ty of K az an) w ill r edu ce the sha rp nes s of th e env ironm ent al p rob lem s in the Mo scow reg ion ( 19 m ill ion. Pe opl e) , a s w el l as in t he

(6)

R epubl ic o f T at ar st an ( 3.9 m ln. Per sons ) ( 1/ 6 to tal R uss ia n popu la tio n) : reduc e the am ount o f bu rie d TK O in th e M osc ow reg ion t o 30 % (abou t 3 000 tho usa nd. m .) t o 2 023 (f rom 95% to 6 5% of th e tot al MSW se nt to t he Mos cow reg ion TC R ), w hi ch cor res ponds to a de cr eas e of bur ial v ol um es by 7% the w hol e ter rit or y of R uss ia. (T he pr oj ec t c ont rib ut es t o t he a chi ev em ent of the m ai n g oal s of the r eg ion i n t he f iel d of w as te m ana gem ent : r educ tion o f dum pi ng MSW vol um es by 45% (4,500 ton s) o f t he t ot al am ount o f M SW se nt to the Mos cow r eg ion. (10000 thou sa nd. M. )) . In K az an w ill tak e you t o t he m odel of “ zer o l an df ill ”, w hi ch, if suc ces sf ul , coul d be ext ended to ot he r m aj or ci ties of R us si a. T hi s m odel inv ol ves the us e of al l m et hod s of tr eat m ent o f MSW , i nc lud ing rec ycl ing of se conda ry raw m at er ia ls and th er m al di spos al , w hi ch c or res po nds to t he b es t i nt er nat iona l p rac tice (S w itz er land, Ge rm any and J apa n) . 4. The pr oj ec t p rev ent s har m ful em iss ions int o the a tm osphe re, su ch as d iox ins, ar e i nev itabl e i n fir e i n land fil ls and land fil ls, fa ci lit ies em iss ions by ther m al tr eat m ent of T C R in m or e t ha n 8000 ti m es low er th an e m is si on s i n fir e in land fil ls. 5. Whe n t he pr oj ec t w ill be loca ted at le ast 55% of the equi pm ent , an d i n the ca se of sc al ing the m odel to o the r r eg ions, th e l oca liz at io n lev el m ay rea ch 80 -90% . The pr oj ec t w ill cr ea te dem and fo r t he R uss ian m anuf ac tur er s of equ ipm ent , i nf ra st ruct ur e con trac tor s and cons truc tion com pani es in t he a m ount of 65 bi lli on. R ubl es . i n t he 20 17 - 2021 bi enni um ., and ope n expor t m ar ket s wi th t he po ten tia l of ov er 650 bi lli on. r ub les . 6. R educ ing g ree nhouse g as em iss ion s as a re sul t of the pr oj ec t w ill am ount to 8 37.5 t ho us. To nnes of C O 2 equi val ent p er y ea r, o r 25.1 m ill ion. Ton nes o f C O 2 for the en tir e pe riod of op er at ion of o bj ect s ( 20 21 - 2051 gg. ). Pr ior ity “ac cum ul at ed d am ag e t o t he e nv ironm ent ”: 1. The ar ea of land af fec ted by the neg at iv e im pac t of o bj ec ts ac cum ul at ed dam ag e w ill be re duce d i n 20 25 t o 1.45 t hou sa nd ha in t he cons tit uen t en tit ies of the R uss ian Fe der at ion, det er m in ed in ac cor danc e w ith t he Rul es of pr ov is ion and di st rib ut io n of sub si di es f rom the fed er al budg et to the bu dg et s of sub jec ts of th e R us si an Fed er at ion to supp or t r eg iona l pr oj ect s i n the fi el d of w as te m ana ge m ent and el im inat ion o f ac cum ul at ed env ironm ent al dam ag e, appr ov ed by R es ol ut ion o f t he R uss ian G ov er nm ent dat ed A ug us t 13 , 2016 № 790 . 2. I m pr ov ing the env ironm ent al con di tion s of the pop ul at ion liv ing on t he te rr itor y of the R uss ian Fede rat ion , sub jec t t o t he neg at iv e im pac t of ob jec ts a cc um ul at ed da m ag e i n 2025 t o 4 .3 m ill ion. Pe opl e i n r eg ions o f t he Ru ss ian Fed er at ion, d et er m ined i n a cc or danc e w ith t he R ul es of p rov isi on and di st ribu tio n of sub si di es fr om the fe de ral b udg et to t he budg et s of the R uss ia n Feder at ion on su ppor t for reg iona l pr oj ect s i n the fiel d of w ast e m ana gem ent and el im inat ion of ac cum ul at ed env ironm ent al dam ag e, appr ov ed by R es ol ut io n of th e Russ ian G ov er nm ent dat ed A ug ust 13 , 2016 № 790 . De sc ript ion o f t he res ul ts of t he pr oj ect ope ra tio n m odel Pr ior ity “Wa st e” : C om m iss ioni ng of the inf ra st ru ct ur e in t he tre at m ent of m uni ci pal sol id w as te m ana ge m ent , t he ope rat ion o f w hi ch w ill pr ov ide wa st e m ana ge m ent and wil l r educ e t he bur den on the env iron m ent .

(7)

106 R epubl ic o f T at ar st an ( 3.9 m ln. Per sons ) ( 1/ 6 to tal R uss ia n popu la tio n) : reduc e the am ount o f bu rie d TK O in th e M osc ow reg ion t o 30 % (abou t 3 000 tho usa nd. m .) t o 2 023 (f rom 95% to 6 5% of th e tot al MSW se nt to t he Mos cow reg ion TC R ), w hi ch cor res ponds to a de cr eas e of bur ial v ol um es by 7% the w hol e ter rit or y of R uss ia. (T he pr oj ec t c ont rib ut es t o t he a chi ev em ent of the m ai n g oal s of the r eg ion i n t he f iel d of w as te m ana gem ent : r educ tion o f dum pi ng MSW vol um es by 45% (4,500 ton s) o f t he t ot al am ount o f M SW se nt to the Mos cow r eg ion. (10000 thou sa nd. M. )) . In K az an w ill tak e you t o t he m odel of “ zer o l an df ill ”, w hi ch, if suc ces sf ul , coul d be ext ended to ot he r m aj or ci ties of R us si a. T hi s m odel inv ol ves the us e of al l m et hod s of tr eat m ent o f MSW , i nc lud ing rec ycl ing of se conda ry raw m at er ia ls and th er m al di spos al , w hi ch c or res po nds to t he b es t i nt er nat iona l p rac tice (S w itz er land, Ge rm any and J apa n) . 4. The pr oj ec t p rev ent s har m ful em iss ions int o the a tm osphe re, su ch as d iox ins, ar e i nev itabl e i n fir e i n land fil ls and land fil ls, fa ci lit ies em iss ions by ther m al tr eat m ent of T C R in m or e t ha n 8000 ti m es low er th an e m is si on s i n fir e in land fil ls. 5. Whe n t he pr oj ec t w ill be loca ted at le ast 55% of the equi pm ent , an d i n the ca se of sc al ing the m odel to o the r r eg ions, th e l oca liz at io n lev el m ay rea ch 80 -90% . The pr oj ec t w ill cr ea te dem and fo r t he R uss ian m anuf ac tur er s of equ ipm ent , i nf ra st ruct ur e con trac tor s and cons truc tion com pani es in t he a m ount of 65 bi lli on. R ubl es . i n t he 20 17 - 2021 bi enni um ., and ope n expor t m ar ket s wi th t he po ten tia l of ov er 650 bi lli on. r ub les . 6. R educ ing g ree nhouse g as em iss ion s as a re sul t of the pr oj ec t w ill am ount to 8 37.5 t ho us. To nnes of C O 2 equi val ent p er y ea r, o r 25.1 m ill ion. Ton nes o f C O 2 for the en tir e pe riod of op er at ion of o bj ect s ( 20 21 - 2051 gg. ). Pr ior ity “ac cum ul at ed d am ag e t o t he e nv ironm ent ”: 1. The ar ea of land af fec ted by the neg at iv e im pac t of o bj ec ts ac cum ul at ed dam ag e w ill be re duce d i n 20 25 t o 1.45 t hou sa nd ha in t he cons tit uen t en tit ies of the R uss ian Fe der at ion, det er m in ed in ac cor danc e w ith t he Rul es of pr ov is ion and di st rib ut io n of sub si di es f rom the fed er al budg et to the bu dg et s of sub jec ts of th e R us si an Fed er at ion to supp or t r eg iona l pr oj ect s i n the fi el d of w as te m ana ge m ent and el im inat ion o f ac cum ul at ed env ironm ent al dam ag e, appr ov ed by R es ol ut ion o f t he R uss ian G ov er nm ent dat ed A ug us t 13 , 2016 № 790 . 2. I m pr ov ing the env ironm ent al con di tion s of the pop ul at ion liv ing on t he te rr itor y of the R uss ian Fede rat ion , sub jec t t o t he neg at iv e im pac t of ob jec ts a cc um ul at ed da m ag e i n 2025 t o 4 .3 m ill ion. Pe opl e i n r eg ions o f t he Ru ss ian Fed er at ion, d et er m ined i n a cc or danc e w ith t he R ul es of p rov isi on and di st ribu tio n of sub si di es fr om the fe de ral b udg et to t he budg et s of the R uss ia n Feder at ion on su ppor t for reg iona l pr oj ect s i n the fiel d of w ast e m ana gem ent and el im inat ion of ac cum ul at ed env ironm ent al dam ag e, appr ov ed by R es ol ut io n of th e Russ ian G ov er nm ent dat ed A ug ust 13 , 2016 № 790 . De sc ript ion o f t he res ul ts of t he pr oj ect ope ra tio n m odel Pr ior ity “Wa st e” : C om m iss ioni ng of the inf ra st ru ct ur e in t he tre at m ent of m uni ci pal sol id w as te m ana ge m ent , t he ope rat ion o f w hi ch w ill pr ov ide wa st e m ana ge m ent and wil l r educ e t he bur den on the env iron m ent . 107 Pro je ct ec on om ic m odel su gg es ts It i nv ol ves the conc lus ion o f con trac ts for pow er sup pl y of ren ewabl e ener gy sour ce s ( he rei naf te r R ES PD M) am ong cons um er s of the w ho les al e el ect rici ty and ca pac ity m ar ket , and ope rat or s of re newab le en er gy g ene rat io n f ac ili ties . D PM pr ov ides a m ec han ism R ES inv es to r r et ur n on inv es tm ent an d pr of itab ili ty th roug h a pr ev iousl y f ixed pa ym ent for the cos t of the in put pow er . The m ai n cond iti on for the im pl em ent at io n of the pr oj ec t i s to sp re ad the R ES P D M m ec hani sm to ob jec ts on t he th er m al tr ea tm ent of w as te fr om pow er g ene rat ion. Prior ity “ac cum ul at ed d am ag e t o t he e nv ironm ent ”: Sel ec tion of p ro jec ts fo r i ncl us ion i n t he nat iona l pr oj ec t “ Cl ea n C ou nt ry ” w as ca rr ied ou t bas ed on t he in for m at ion of the R us si an Feder at ion on the fac ili tie s pr ov ided by the sub jec ts of the acc um ul at ed dam ag e to t he env ironm ent , as w el l as th e pr ov is ion s of the “R ul es o f p rov isi on an d d is tri bu tion o f s ubs idi es fr om the fede ral budg et to th e b ud get s of sub je ct s of the R uss ian Fed er at ion to sup por t reg iona l p ro jec ts in the fiel d o f w ast e m ana gem ent and el im inat ion o f a cc um ul at ed env ironm ent al da m ag e, appr ov ed by R F G ov er nm ent D ec ree № 790 of A ug ust 13 , 2016 pr oj ec t se lec tion c rit er ia : ob jec ts ar e not exp loi ted ; fac ili ties ow ned by th e Rus si an F ede ra tion or m uni ci pal p rope rty ; the p res enc e of the appr ov ed de si gn and e st im at e d ocu m ent at ion ; av ai lab ili ty of the nec es sar y expe rti se , pr ov ide d by the R uss ian Fed er at ion; env ironm ent al an d s oci al e ffec ts of th e im pl em ent at io n of m ea sur es (num ber o f peopl e expos ed to the neg at iv e im pac t o f p ol lut ed te rri to ry a re a); co -fi nanc ing by the Russ ia n Fede rat ion. The el im inat ion o f ac cum ul at ed d am ag e t o ob jec ts tha t r epr es ent the g rea te st e nv ironm ent al ri sk s. The i m pl em ent at ion of the p rior ity pr oj ec t w ill p rov ide : inv ol vem ent in ec onom ic c ircul at ion res to red, inc lud in g r ec la im ed l ands ; im pr ov ing land qua lit y; incr ea si ng th e inv es tm ent a ttr ac tiv ene ss of the ar ea s pr ev iousl y exp er ienc ing a ne gat iv e im pac t f rom the cum ul at iv e dam ag e to the e nv ironm ent . Whe n i m pl em ent at ion of th e pr ior ity pr oj ect s w ill be for m ed st at e reg is ter of ob je ct s of ac cum ul at ed env iron m ent al dam ag e, in or de r t o con trol the f or m at ion of unau tho riz ed was te d ispos al si te s wil l be us ed by the i nf or m at ion so ci et y sy st em of int er ac tion o f st at e bo di es and th ei r de tec tion, s uppr es si on and e lim in at ion (FG IS “O ur nat ur e” ).

(8)

ST AGE S AND R EF ER EN C E P O INT S N. N ame Ty pe ( end st ag e/ con tro l po int ) tim e Pri or ity Pro je ct C lea n C oun try 1 Pass po rt pr oj ec t ap pr ov ed C hec k Point 21/ 12 /2016 2 The m as ter p lan is app rov ed C hec k Point 02/ 25 /2017 3. Pri or ity of “ w as te ” 3.1 The R es ol ut ion of the Ru ss ian Gov er nm ent “O n appr ov al of r ul es f or det er m ini ng t he pr ice a t t he pow er gene rat ing f ac ili ties op er at ing on t he ba si s of t he use of w as te pr oduc tion and cons um pt io n, and on am endm ent s t o s om e ac ts of th e G ov er nm ent of t he R uss ia n Fede rat ion o n t he us e of r ene w ab le ene rg ies in the who les al e e lec tri ci ty and c ap ac ity m ar ket ” C hec k Point 30/ 12 /2016 3.2 C om pet iti ve sel ec tion of in ves tm ent pr oj ec ts fo r t he const ruc tio n of gene rat ing fac ili tie s that op er at e thr oug h t he use of p roduct ion and cons um pt ion w as te C om pl et ion p has e 04/ 28 /2017 3.2.1 Publi ca tion of res ul ts o f pr oj ec t s el ect ion C hec k Point 04/ 28 /2017 3.3 C oncl ud ed c apa ci ty supp ly ag ree m ent s ( C SA ) C hec k Point 07/ 01 /2 017 3.4 Sel ec tion o f l an d p lot s for the pl ace m ent o f o bj ect s on t he the rm al tre at m ent o f T C R and cl ea ranc e nec ess ar y per m its (M osc ow reg ion, K az an) C om pl et ion p has e 04/ 12 /2017 3.4.1 C ont ra ct s ha ve be en s ig ned on t he re sul ts o f t he pu bl ic hea ring s C hec k P oi nt 01/ 19 /2017 3.4.2 Fra m ed t itl e docum ent s f or land p lo ts C hec k Point 03/ 01 /2017 3.4.3 D ec or at ed ur ban l and p lan s C hec k Point 04/ 12 /2017 3.5 A n as se ss m ent of the env ironm ent al im pac t as se ss m en t ( EI A ) C om pl et ion p has e 04/ 13 /2017 3.5.1 A n appr ov al of the EI A in R ospot rebn adz or C hec k Point 04/ 13 /2017 3.5.2 A n opi ni on on the re sul ts o f pub lic hea ring s C hec k Point 04/ 13 /2017 3.6 D es ign C om pl et ion p has e 21/ 10 /2017 3.6.1 I r ec ei ved a pac kag e of d es ig n and e st im at e doc um ent at ion C hec k Point 08/ 01 /2017 3.6 .2 O bt ai n exp er t opi ni on C hec k Point 03/ 10 /2017 3.6.3 R ec ei ved p er m iss ion t o bui ld C hec k Point 21/ 10 /2017 3.7 C onst ruc tion of fa ci lit ies , i ncl ud ing the cons truct ion, in st al lat ion a nd com m iss ioni ng w or k C om pl et ion p has e 01/ 23 /2021 3.8 Local iz at ion o f pr oduc tion equi pm ent a nd se rv ice s C om pl et ion p has e 01/ 10 /2021

(9)

108 ST AGE S AND R EF ER EN C E P O INT S N. N ame Ty pe ( end st ag e/ con tro l po int ) tim e Pri or ity Pro je ct C lea n C oun try 1 Pass po rt pr oj ec t ap pr ov ed C hec k Point 21/ 12 /2016 2 The m as ter p lan is app rov ed C hec k Point 02/ 25 /2017 3. Pri or ity of “ w as te ” 3.1 The R es ol ut ion of the Ru ss ian Gov er nm ent “O n appr ov al of r ul es f or det er m ini ng t he pr ice a t t he pow er gene rat ing f ac ili ties op er at ing on t he ba si s of t he use of w as te pr oduc tion and cons um pt io n, and on am endm ent s t o s om e ac ts of th e G ov er nm ent of t he R uss ia n Fede rat ion o n t he us e of r ene w ab le ene rg ies in the who les al e e lec tri ci ty and c ap ac ity m ar ket ” C hec k Point 30/ 12 /2016 3.2 C om pet iti ve sel ec tion of in ves tm ent pr oj ec ts fo r t he const ruc tio n of gene rat ing fac ili tie s that op er at e thr oug h t he use of p roduct ion and cons um pt ion w as te C om pl et ion p has e 04/ 28 /2017 3.2.1 Publi ca tion of res ul ts o f pr oj ec t s el ect ion C hec k Point 04/ 28 /2017 3.3 C oncl ud ed c apa ci ty supp ly ag ree m ent s ( C SA ) C hec k Point 07/ 01 /2 017 3.4 Sel ec tion o f l an d p lot s for the pl ace m ent o f o bj ect s on t he the rm al tre at m ent o f T C R and cl ea ranc e nec ess ar y per m its (M osc ow reg ion, K az an) C om pl et ion p has e 04/ 12 /2017 3.4.1 C ont ra ct s ha ve be en s ig ned on t he re sul ts o f t he pu bl ic hea ring s C hec k P oi nt 01/ 19 /2017 3.4.2 Fra m ed t itl e docum ent s f or land p lo ts C hec k Point 03/ 01 /2017 3.4.3 D ec or at ed ur ban l and p lan s C hec k Point 04/ 12 /2017 3.5 A n as se ss m ent of the env ironm ent al im pac t as se ss m en t ( EI A ) C om pl et ion p has e 04/ 13 /2017 3.5.1 A n appr ov al of the EI A in R ospot rebn adz or C hec k Point 04/ 13 /2017 3.5.2 A n opi ni on on the re sul ts o f pub lic hea ring s C hec k Point 04/ 13 /2017 3.6 D es ign C om pl et ion p has e 21/ 10 /2017 3.6.1 I r ec ei ved a pac kag e of d es ig n and e st im at e doc um ent at ion C hec k Point 08/ 01 /2017 3.6 .2 O bt ai n exp er t opi ni on C hec k Point 03/ 10 /2017 3.6.3 R ec ei ved p er m iss ion t o bui ld C hec k Point 21/ 10 /2017 3.7 C onst ruc tion of fa ci lit ies , i ncl ud ing the cons truct ion, in st al lat ion a nd com m iss ioni ng w or k C om pl et ion p has e 01/ 23 /2021 3.8 Local iz at ion o f pr oduc tion equi pm ent a nd se rv ice s C om pl et ion p has e 01/ 10 /2021 109 3.9 Pla nt s de riv ed its de si gn ca pac ity C hec k Point 01/ 01 /2022 3.10 It r educ ed the am ount of d um pi ng T K O by 7% in t he w hol e of the R uss ian Fed er at ion C hec k Point 01/ 01 /2023 3.1 1 R educ ing the neg at iv e im pac t on the pop ul at ion of M osc ow R eg ion num ber ing 19 m ill ion . Peo pl e. C hec k Point 01/ 01 /2023 3.12 R educ ing th e neg at iv e im pac t o n t he popu la tio n of th e R epub lic of Tat ar st an, num ber ing 3.9 m ill ion . Peop le. C hec k Point 01/ 01 /2023 3.13 Prov ided el ec tri ci ty g ene ra tion dur ing t he op er at ion of p lan ts for MSW th er m al tr ea tm ent - 2.68 bi lli on k Wh a nnua lly . C hec k Point 01/ 01 /2023 3.14 O per at ion of p lan ts to c om pl et ion C om pl et ion p has e 30/ 10 /2025 3.15 Propos al s fo r t he fur the r d iss em inat ion o f expe rienc e bui ldi ng and oper at ing pl ant s w ith a t her m al des tru ct ion of MSW pow er ext rac tion in the Ru ss ian F eder at io n C hec k Point 01/ 11/ 20 22 4. Pri or ity “ ac cum ul at ed da m ag e to the env ironm ent ” 4.1 A gr ee m ent on t he pr ov isi on of sub si di es t o t he su bj ec ts of t he Ru ssi an F ede rat ion si gned i n 201 7, s ubs idi es to co -fi nanc e im pl em ent at io n o f t he a ct iv iti es pr ov ided by the R us si an Fed er at ion sub je ct s C hec k Point 03/ 01 /2017 4.2 C om pet iti ve se lec tion of Per fo rm er s, the conc lus ion of pub lic cont rac ts w ith in t he bu dg et li m its i n 201 7 C om pl et ion p has e 05/ 31 /2017 4.3 The te nde r pr oce du res com pl et ed C hec k Point 05/ 31 /2017 4.4 Publi c c on trac ts a re s ig ned C hec k Point 05/ 31 /2017 4.5 The se lec tion of pr oj ec ts fo r f un di ng fo r 2018 C hec k Point 01/ 11/ 20 17 4.6 Form ed and upda ted inf or m at ion sy st em , t he pr oce du re fo r int er act ion bet w een soc iet y and gov er nm ent ag enc ie s to i dent ify , com bat and e lim ina te una ut hor iz ed w as te di spos al si te s ( FG IS “Ou r nat ur e” ) C hec k Point 31/ 12 /2017 4.7 Ev ent s w ith the ter m of co m pl et ion o f t he w or k com pl et ed i n 2017 , rec lai m ed 1.4 he ct ar es of l and, i m pr ov ed ec ol og ica l l iv ing condi tions f or m or e t han 90 thous and. P eopl e. C hec k Point 31/ 12 /2017 4.8 C om pet iti ve se lec tion of Per fo rm er s, the conc lus ion of pub lic cont rac ts w ith in t he bu dg et li m its in 201 8 C om pl et ion p has e 05/ 31 /2018 4.9 The te nde r pr oce du res cond uct ed C hec k Point 05/ 31 /2018 4.10 Publi c c on trac ts a re s ig ned C hec k Point 05/ 31 /2018

(10)

4.1 1 The se lec tion of pr oj ec ts fo r f un di ng in 2019 C hec k Point 01/ 11/ 20 18 4.12 Ev ent s wit h t he t er m of co m pl et ion of the work com pl et ed in 20 18 , rec lai m ed 1,000 hec tar es of l and, i m pr ov ed ec ol og ica l liv ing condi tions f or the m or e t ha n 1.4 m ill ion. p eopl e. C hec k Point 31.12.2018 4.13 C om pet iti ve se lec tion of Per fo rm er s, the conc lus ion of pub lic cont rac ts w ith in the bu dg et lim its in 201 9 C om pl et ion p has e 05/ 31 /2019 4.14 The te nde r pr oce du res cond uct ed C hec k Point 05/ 31 /2019 4.15 Publi c c on trac ts a re s ig ned C hec k Point 05/ 31 /2019 4.16 The pl an of f ina nci al sup por t of t he pr oj ect on t he 2020 -2025 bi enn ium . C hec k Point 15/ 11/ 20 19 4.17 Ev ent s wit h t he t er m com pl et ion of the w or k com pl et ed i n 20 19 C hec k Point 31.12.2019 4.18 A pl an o f m ea sur es f or e lim inat ion of ac cum ul at ed d am ag e to the env ironm ent , ap pr ov ed by the sp ec ifi ed t ar ge ts for the im pl em ent at io n of ac tiv iti es in t he 20 20 - 2025 bi enni um . C hang es to t he pr oj ect pas spor t. C hec k Point 31.12.2019 4.19 Im pl em ent ed al l t he m ea sur es a im ed at t he el im inat ion o f ac cum ul at ed dam ag e to t he env ironm ent f rom w as te di spo sa l, p as t in du str ia l a ctiv iti es C om pl et ion p has e 09/ 30 /2025 5 A repor t t o the G ov er nm ent on t he com pl et ion of p ro jec t a ct iv iti es , as se ss m ent of tar get ac hi ev em ent C om pl et ion p has e 30/ 12 /2025 6 The fi na l r epor t i s a pp rov ed , t he p ro jec t i s c om pl et ed C hec k Point 30/ 12 /2025

(11)

110 4.1 1 The se lec tion of pr oj ec ts fo r f un di ng in 2019 C hec k Point 01/ 11/ 20 18 4.12 Ev ent s wit h t he t er m of co m pl et ion of the work com pl et ed in 20 18 , rec lai m ed 1,000 hec tar es of l and, i m pr ov ed ec ol og ica l liv ing condi tions f or the m or e t ha n 1.4 m ill ion. p eopl e. C hec k Point 31.12.2018 4.13 C om pet iti ve se lec tion of Per fo rm er s, the conc lus ion of pub lic cont rac ts w ith in the bu dg et lim its in 201 9 C om pl et ion p has e 05/ 31 /2019 4.14 The te nde r pr oce du res cond uct ed C hec k Point 05/ 31 /2019 4.15 Publi c c on trac ts a re s ig ned C hec k Point 05/ 31 /2019 4.16 The pl an of f ina nci al sup por t of t he pr oj ect on t he 2020 -2025 bi enn ium . C hec k Point 15/ 11/ 20 19 4.17 Ev ent s wit h t he t er m com pl et ion of the w or k com pl et ed i n 20 19 C hec k Point 31.12.2019 4.18 A pl an o f m ea sur es f or e lim inat ion of ac cum ul at ed d am ag e to the env ironm ent , ap pr ov ed by the sp ec ifi ed t ar ge ts for the im pl em ent at io n of ac tiv iti es in t he 20 20 - 2025 bi enni um . C hang es to t he pr oj ect pas spor t. C hec k Point 31.12.2019 4.19 Im pl em ent ed al l t he m ea sur es a im ed at t he el im inat ion o f ac cum ul at ed dam ag e to t he env ironm ent f rom w as te di spo sa l, p as t in du str ia l a ctiv iti es C om pl et ion p has e 09/ 30 /2025 5 A repor t t o the G ov er nm ent on t he com pl et ion of p ro jec t a ct iv iti es , as se ss m ent of tar get ac hi ev em ent C om pl et ion p has e 30/ 12 /2025 6 The fi na l r epor t i s a pp rov ed , t he p ro jec t i s c om pl et ed C hec k Point 30/ 12 /2025 111 B U D G ET PR IO RT Y PR O JEC TS Sourc es of fi nan ci ng Yea r o f r ea liz at ion To ta l 2016 2017 2018 2019 2020 -2025 Pr ior ity “Wa st e” B udg et ar y sources , m illio n r ub le s. fede ra l - - - - - - Sub jec ts of t he R uss ian Feder at ion * - - - - 5 543.24 5 543.24 loca l - - - - - - Extr a-budg et ar y sou rc es, m ln. R ub. - 23 717.12 64 427.26 65 522.04 84 200. 11 237 866.53 TO TA L - 23 717.12 64 427.26 65 522.04 89 743 35 243 409.77 Pr ior ity “ac cum ul at ed d am ag e t o t he e nv ironm ent ” Sourc es of fi nan ci ng Yea r o f r ea liz at ion Total ** 2016 2017 2018 2019 2020 - 2025 B udg et ar y sour ces , m ill io n rubl es . Feder al * ** - 2923.39 2471.06 2435.2 210.84 ** 8040.49 ** Sub jec ts of t he R uss ian Feder at ion - 1723.53 ** 996.12 ** 1039.12 ** 90.36 ** 3849.13 ** loca l - - - - - - Extr a-budg et ar y sou rce s, m ln. R ub. - - - - - - TO TA L - 4646.92 ** 3467.17 ** 3474.32 ** 301.20 ** 11 889. 62 ** * Th e pr oj ect inv ol ves th e suppor t o f t he R us si an Fed er at ion onl y i n t he fo rm of exe m pt ions on p rope rty tax and the reg iona l pa rt i nc om e tax for 15 yea rs af te r t he ther m al tr eat m ent fac ilit ie s T K O a t f ull ca pa ci ty ** R equ ire s c la rif ic at ion i n t he abs ence of conf irm at ion on the am ount of res our ce suppor t f rom the budg et s o f t he R uss ian Fe de ra tio n ( 201 7 -. 2019) fr om the fede ral budg et and the budg et s o f t he Russ ian F ede rat ion for 2 020 - 20 25 . *** - I ncl uded i n the to tal c ost o f m ai nt ai ni ng depa rtm ent al p ro jec t of fice , m ill ion rubl es : 2017 - 31.5067 ;. 20 18 - 30.51 18 ; 20 19 - 29.8485 The d ist ribut ion of g ra nt s t o sub jec ts of th e R us si an Fe der at io n c ar rie d ou t on th e bas is of o rde rs of the R uss ian Fed er at ion fr om O ct ob er 27, 20 16 № D K -P13 -226pr “O n t he di st ribu tio n of subs idi es an d ot her in ter -budg et tr ansf er s f rom the f ed er al b udg et to the b udg et s o f sub jec ts of the Ru ss ian Fed er at ion, t he fed er al law on th e fede ra l budg et fo r 2 017 a nd t he pl an ni ng bet w een 201 8 and 2019 y ea rs “, the vol um e of al loc at ed f unds is d et er m ined in ac cor danc e w ith the lev el of co -fi nanc ing lim it o f exp endi tu re c om m itm ent s of the Ru ss ian F ede rat ion fr om the fede ra l bud get of th e Rus si an Fede ra tion sub jec ts for 2 017 .

(12)

KE Y R IS K S AND OP POR TUNI TI ES N. N am e of ri sk /opp or tuni ty Ev ent of ri sk pr ev en tio n/ im pl em ent at ion ca pabi lit es 1. Failur e or d el ay in the ado pt io n of reg ul at or y l eg al ac ts of th e R uss ian Fed er at ion, t he m ec hani sm of spr ea di ng of R ES PD M ob jec ts on t he ther m al tr ea tm ent of T C R ; am endm ent s to t he Feder al L aw of Jul y 3, 201 6 № 254 -FZ “O n A m end m ent s to C er ta in Leg is lat iv e A ct s of the R uss ian Feder at ion ” i n t he pa rt o f t he tran sf er of the pr ov isi on s def ini ng the obl ig at ion t o i nse rt ob jec ts int o the st at e reg ist er fo r w or k on el im inat ion Rev ital iz at ion and con tro l of pe rf or m anc e tim e for th e dev el opm ent , co or di na tio n of dr af t no rm at iv e l eg al a ct s of the fede ra l ex ec ut iv e b odi es and the ir adop tio n 2. The la ck of f in anc ial r es our ce s fo r t he im pl em ent at ion o f pri ori ty p ro je ct a ctiv itie s Pla nn ing and cont rol o f i sol at ion a nd br ing the budg et li m its fund ing indi vi dua l st ag es o f w or k f rom t he fede ral b udg et and the con sol ida ted bu dg et s of t he RF cons tit uen t ent iti es, pr iv at e inv es to rs, cr ea ting f av or abl e co ndi tio ns f or pr iv at e inv es to rs (ta x br ea ks, PPPs, et c. ) 3. Im pr ov ing t he soc ial s ig ni fica nce o f the ac tiv iti es of t he pr io rity p ro je ct. C rea ting jobs in the im pl em ent at ion of m ea sur es inc rea si ng aware ne ss by inf or m in g about ac hi ev ing env ironm ent al ef fec t i n t er m s of r ed uci ng ob jec ts MSW bu rial , reduc ing t he env ironm ent al l oad in the te rr ito ry and popul at ions expo se d to the neg at iv e i m pac t o f ob jec ts ac cum ul at ed e nv ironm ent al har m to t he e nv iro nm ent .

(13)

112 KE Y R IS K S AND OP POR TUNI TI ES N. N am e of ri sk /opp or tuni ty Ev ent of ri sk pr ev en tio n/ im pl em ent at ion ca pabi lit es 1. Failur e or d el ay in the ado pt io n of reg ul at or y l eg al ac ts of th e R uss ian Fed er at ion, t he m ec hani sm of spr ea di ng of R ES PD M ob jec ts on t he ther m al tr ea tm ent of T C R ; am endm ent s to t he Feder al L aw of Jul y 3, 201 6 № 254 -FZ “O n A m end m ent s to C er ta in Leg is lat iv e A ct s of the R uss ian Feder at ion ” i n t he pa rt o f t he tran sf er of the pr ov isi on s def ini ng the obl ig at ion t o i nse rt ob jec ts int o the st at e reg ist er fo r w or k on el im inat ion Rev ital iz at ion and con tro l of pe rf or m anc e tim e for th e dev el opm ent , co or di na tio n of dr af t no rm at iv e l eg al a ct s of the fede ra l ex ec ut iv e b odi es and the ir adop tio n 2. The la ck of f in anc ial r es our ce s fo r t he im pl em ent at ion o f pri ori ty p ro je ct a ctiv itie s Pla nn ing and cont rol o f i sol at ion a nd br ing the budg et li m its fund ing indi vi dua l st ag es o f w or k f rom t he fede ral b udg et and the con sol ida ted bu dg et s of t he RF cons tit uen t ent iti es, pr iv at e inv es to rs, cr ea ting f av or abl e co ndi tio ns f or pr iv at e inv es to rs (ta x br ea ks, PPPs, et c. ) 3. Im pr ov ing t he soc ial s ig ni fica nce o f the ac tiv iti es of t he pr io rity p ro je ct. C rea ting jobs in the im pl em ent at ion of m ea sur es inc rea si ng aware ne ss by inf or m in g about ac hi ev ing env ironm ent al ef fec t i n t er m s of r ed uci ng ob jec ts MSW bu rial , reduc ing t he env ironm ent al l oad in the te rr ito ry and popul at ions expo se d to the neg at iv e i m pac t o f ob jec ts ac cum ul at ed e nv ironm ent al har m to t he e nv iro nm ent . 113 D ES C R IPT IO N O F P R IO R IT Y PR O JEC TS C om m uni ca tion w ith Sta te p rog ram of th e Rus si an Feder at ion The pr oj ect is im pl em ent ed wit hi n t he f ram ework of th e St at e p rog ram of the R uss ian Fe der at ion “P ro te ctio n Env ironm ent “ on 20 12 - 2020 (ap pr ov ed by R es ol ut ion of th e Rus si an G ov er nm ent da ted A pr il 15 , 2 014 № 32 6) Link in g w ith o th er p ro ject s and pr og ram s Pri or ity pr oj ec t i s l ink ed t o reg iona l pr og ram s i n t he fie ld of env ironm ent al p rot ec tion an d w as te m ana gem ent . Form al g rounds for in iti at in g Pass po rt pr oj ec t “ Cl ea n C ount ry ” w as pr epar ed on t he bas is of the Pro toco l o f t he C ounci l m ee ting of the Pr es idi um of the R us si an Feder at ion P res iden t f or S trat eg ic D ev el opm ent and th e pr ior ity pr oj ect num ber 3 dat ed A ug ust 31, 201 6 or de r of the Mi ni st ry of R uss ia № 22 -r of Sep tem ber 15, 2016 “O n t he fo rm at io n of th e W or ki ng G roup on the pr epa ra tio n of p as sp or ts of pr ior ity pr oj ec ts. “ The pr oj ect is a im ed a t s ol vi ng the tas ks de fin ed i n t he fol low ing docum ent s: 1. B as ics o f t he st at e pol icy in t he fie ld of env ironm ent al dev el opm ent o f t he R uss ia n Feder at ion for the per iod up t o 20 30 (a ppr ov ed by the Pre si de nt o f t he R uss ian Fed er at ion o f A pr il 30, 2012) (t ask s f or the pr ev ent ion and red uct ion o f t he cu rr ent neg at iv e imp ac t on t he env ironm ent , ens ur e env ironm ent al ly sound wa st e m ana gem ent and r es to rat ion o f dam ag ed na tur al ec ol og ica l s yst em s) ; The m ai n ac tiv iti es of the R uss ian Fed er at ion f or the p er iod up 2018 (appr ov ed by the Ch ai rm an of th e Gov er nm ent o f t he R uss ian F ede ra tion of Ma y 14 , 201 5) (us e of na tu ral re sour ce s and th e env ironm ent ); The s ta te pr og ram “ Env iro nm ent ” on 2012 - 2020 (a ppr ov ed by R es ol ut ion o f t he R uss ian G ov er nm ent d at ed A pr il 15 , 2014 № 326 ). Pla n key ac tiv iti es for the in 2017 in t he R uss ian Fed er at ion Y ea r of Eco log y ( appr ov ed by the Fede ral G ov er nm ent on J un e 2, 2016 № 1082 -p A ddi tiona l I nf or m at ion The m ai n c ond iti on f or th e im pl em ent at io n of th e pi lot pr oj ec t f or the con st ruc tion of g ene ra ting fac ili ties for ther m al tr eat m ent o f m uni ci pal sol id w ast e i n th e Mos cow reg ion and in t he R epub lic of T at ar st an is the spr ea d o f r ene w abl e ene rgy fac ili ties on th e D PM m ec hani sm for the rm al w as te d isp osa l.

参照

関連したドキュメント

放射性廃棄物処理配管における接続調査結果 8福島第二原子力発電所1号機 原子炉建屋

東京都船舶調査(H19 推計):東京都環境局委託 平成 19 年度船舶排ガス対策効果の解析調査報告書 いであ(株) (平成 20 年3月).. OPRF 調査(H12

平成 19 年度において最も多く赤潮の優占種となったプランクトンは、 Skeletonema costatum (珪 藻類) 及び Thalassiosira

2. 「STOP&GO ボディ・シェイプ編」 3. 「STOP&GO

これからはしっかりかもうと 思います。かむことは、そこ まで大事じゃないと思って いたけど、毒消し効果があ

(2)工場等廃止時の調査  ア  調査報告期限  イ  調査義務者  ウ  調査対象地  エ  汚染状況調査の方法  オ 

消費電力の大きい家電製品は、冬は平日午後 5~6 時前後での同時使用は控える

写真① 西側路盤整備完了 写真② 南側路盤整備完了 写真④ 構台ステージ状況 写真⑤