• 検索結果がありません。

鹿児島大学リポジトリ

N/A
N/A
Protected

Academic year: 2021

シェア "鹿児島大学リポジトリ"

Copied!
2
0
0

読み込み中.... (全文を見る)

全文

(1)

The Route of the Keiten-Maru for the 1990

Survey of the Research Project, "Man and the

Environment in Papua New Guinea"

journal or

publication title

南太平洋海域調査研究報告=Occasional papers

volume

21

page range

viii-viii

(2)

viii

THE ROUTE OF THE KEITEN-MARU FOR THE 1990 SURVEY OF THE

RESEARCH PROJECT, "MAN AND THE ENVIRONMENT IN PAPUA NEW GUiNEA"

Arrival and Departure Dates at the Ports

Port Arrival Date Departure Date Kagoshima Port Moresby Lae Kagoshima 20 November, 1990 30 November, 1990 17 December, 1990 5 November, 1990 26 November, 1990 7 December, 1990

The broad line represents the outbound course and the narrow line the homeward bound

参照

関連したドキュメント

Table 2.1 displays the expected call volume, average handling times, minimum staffing requirements, optimal sta ffi ng levels, and quality of service estimates for the first 24

1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 0. 10 20 30 40 50 60 70 80

We consider numerical simulations of a compressible fluid in a spherical shell rotating at a constant rotation rate ⌦ about the z-axis.. Entropy is given in units of s, the

1990 1995 2000 2005 2010 2015 2020. 30 25 20 15 10

To strictly prevent gold smuggling at the border, Japan Customs, under the Customs and Tariff Bureau of the Ministry of Finance, will exchange information with the Immigration

Lots PF3V6200W* with date code 1745 All other lots with date code > 1844 Change Category: Wafer Fab Change.. Assembly Change Test

ON Semiconductor Seremban, Malaysia Stars Microelectronics, Thailand There is no product marking change as a result of this change. Reason / Motivation for

[1]Comite Euro-International du Beton : CEB-FIP MODEL CODE 1990 (DESIGN