CONCLUSIONS

ドキュメント内 関西学院大学リポジトリ (ページ 89-100)

In this thesis, we have proposed a FMCDM model, using Fuzzy DEMATEL, ANP and VIKOR methods for probing the maturity of project team models problems and how to evaluate and create a best implementation for achieving the aspired levels.

In chapter 1, research background and organization of thesis was included. In chapter 2, we introduced the fuzzy set theory. The most critical contribution of fuzzy set theory is its capability of representing imprecise or vague data. Although fuzzy sets have found a great success in engineering, their impact in social sciences has been rather limited. Several scholars have attempted to introduce fuzzy sets concepts to social science community. Preliminaries on fuzzy sets and fuzzy number, 𝛂-cut, and fuzzy linguistic scale are introduced in this chapter.

In chapter 3, we have discussed the definitions and theory of fuzzy multiple criteria decision making method. A hybrid MCDM model combined with Fuzzy DEMATEL and ANP for evaluating and improving problems is more suitable in the real world than the previously available methods under complex environments and situations in dynamics, dependence and feedback among dimensions and criteria. The VIKOR method was developed for multicriteria optimization of complex systems. It determines the compromise ranking-list, the compromise solution, and the weight stability intervals for preference stability of the compromise solution obtained with the initial (given) weights. This method focuses on ranking and selecting from a set of alternatives in the presence of conflicting criteria. It introduces the multicriteria ranking index based on the particular measure of ―closeness‖ to the ―ideal‖ solution.

In chapter 4, we have proposed the concept of project maturity and model.

Maturity is the quality or state of being mature. If we apply the concept of maturity to an organization it might refer to a state where the organization is in a perfect condition to achieve its objectives. Project maturity would then mean that the organization is perfectly conditioned to deal with its projects. First, we have considered capability maturity model for software, K-PMMM and OPM3. Then, we found the dimension and criteria of HPPT, PTEM and AIPT model based on expert judgment and literature.

In chapter 5, we adopt Fuzzy DEMATEL to build up a structure model of teamwork competency evaluation system of HPPT, PTEM and AIPT. And then combining ANP, convert the attribution impact of teamwork competency evaluation criteria in the importance degree of each project maturity team, and establish teamwork competency assessment model. Finally, apply VIKOR to evaluate the teamwork performance of HPPT, PTEM and AIPT, and find out the case (A

corporation) which was identified to have the worst attribute according to teamwork competency of team. In the end, a decision was made through system structure model and concrete improvement strategies are proposed.

The following summarizes the important findings of this thesis. Using the Fuzzy DEMATEL in conjunction with an ANP, we can discover the relative weights of various criteria. The Fuzzy DEMATEL works in an ANP to construct a building decision model and influence degree for high performance project team (HPPT), project team effectiveness maturity (PTEM) and agile Innovation project team (AIPT), which may be worthy subjects of further research. The Fuzzy DEMATEL technique carries out the comparisons in pairs of mutual relationships. This surveys the materials and clarifies the essence of problems based on the novel hybrid MCDM model method, and it may help to make future plans. In addition, the model is well suited to deal with decision problems, whose constructs are complicated and whose criteria are interdependent. Because the factors possessed interrelations and self-feedback relationships proved by the Fuzzy DEMATEL technique, then ANP was utilized to calculate each weight of the criteria. Furthermore, uses VIKOR method to analyze the performance of HPPT, PTEM and AIPT to indicate the criteria‘s gap to anticipated level for managers to improve the team maturity of project.

In the future, we advise to keep in researching about the dimension of external environment which is including some criteria like human, finance, resources, and organization supports. Then, to recognize the relative superiority and degree of maturity in the cross-sectional domestic enterprises after they adopt project team management method for providing a reference to domestic enterprises targets about team promoting and team management methods.

Reference

Aubry, M., Hobbs, B., and Thuillier, D. (2007). A new framework for understanding organizational project management through the PMO, International Journal of Project Management. 25(4):328-336.

Balck, H. (1990). Projects as a form of change. In: R. Gareis (editor), Handbook of management by projects. Vienna: MANZsche Verlags. 22–28.

Belassi, W. and Tukel, O.I. (1996). A new framework for determining critical success/failure factors in projects, International Journal of Project Management.

14(3):141-151.

Benko, C., and McFarlan, F.W. (2003). Connecting the dots: aligning projects with objectives in unpredictable times. Boston: Harvard Business School Press.

Betz, F. (1993). Managing Technology Competing Through New Ventures, Innovation, and Corporate Research, Prentice Hall, N.J.

BIA (business improvement architects) (2005), The impact of implementing a project management office-report on the results of the on-line survey, Extracted from:

www.bia.ca on 09-06-05.

Block, T.R., and Frame, J.D. (1998). The project office-a key to managing projects effectively, Crisp Publications.

Bodjanova, S. (2002). A generalizedα-cut. Fuzzy Sets and Systems. 126:157–176.

Boukas E. K., Liu Z. and P. Shi. (2002). Delay-dependent stability and output feedback stabilization of Markov jump systems with time-delay, IEE-Part D, Control Theory and Applications. 149(5):379-386.

Bozdag˘, C. E., Kahraman, C., and Ruan, D. (2003). Fuzzy group decision making for selection among computer integrated manufacturing Systems. Computers in Industry, 51:13–29.

Brian, H., Monique, A., Denis, T. (2008). The high performance project team as an organizational innovation. International Journal of Project Management.

26:547-555.

Buckley, J. J. (1985). Fuzzy hierarchical analysis. Fuzzy Sets and Systems.

17(3):233–247.

Buckley, J. J. (1985). Fuzzy hierarchical analysis. Fuzzy Sets and Systems. 17:

233–247.

Campion,M.A., Medsker, G.J., and Higgs, A.C. (1993). Relations Between Work Group Characteristics and Effectiveness: Implication for Designing Effective Work Groups, Personnel Psychology. 46:825.

Chang, D.Y. (1992). In: Extent Analysis and Synthetic Decision, Optimization echniques and Applications. 1. World Scientific, Singapore, 352.

Chang, D.Y. (1996). Applications of the extent analysis method on fuzzy AHP.

European Journal of Operational Research. 95:649–655.

Chang, Y. Y., Kuan, M. J., Chuang, Y. C., Tzeng, G. H. (2011). Exploring the SPM System Structure Model by Using Fuzzy DEMATEL for NPD, IEEE International Conference on Fuzzy Systems, Taipei, Taiwan.

Chen, T. Y., J. C. Wang, and G. H. Tzeng. (2000). Identification of general fuzzy measures by genetic algorithms based on partial information. IEEE Transactions on Systems, Man, and Cybernetics Part B: Cybernetics. 30B(4):517–528.

Chen, Y. W., and G. H. Tzeng. (2001). Using fuzzy integral for evaluating subjectively perceived travel costs in a traffic assignment model. European Journal of Operational Research. 130(3):653–664.

Cheng, C. H. (1997). Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. European Journal of Operational Research. 96:343–350.

Chiou, H. K., and Tzeng, G. H. (2002). Fuzzy Multiple-Criteria Decision-Making Approach for Industrial Green Engineering. Environmental Management. 30(6):

816–830.

Christine Xiaoyi, D., and William Wells G. (2004). An exploration of high performance project team features and their relationship to project performance, International Journal of Project Management. 22:523-532.

Cleland, D. I., and Ireland, L. R. (2006). Project Management: Strategic Design and Implementation (Fifth Edition). New York: McGraw-Hill Professional.

Cohen, S.G., and Bailey, D.E. (1997). What Makes Teams Work: Roup Effectiveness Research from the Shop Floor to the Executive Suite, Journal of Management.

23(3):239-290.

Self-Managing Work Team Effectiveness, Human Relations. 49(5):647.

Cooke-Davies., Terence, J., Schlichter F, J. Bredillet, C. Beyond the PMBOK1 Guide.

PMI Annual Seminars and Symposium 2001. Nashville TS. 2001.

Cooper, R. G., Edgett S. J., and Kleinschmidt, E. J.(1997). Portfolio management in new product development:Lesson from the leaders-part I. Research-Technology Management. 45(5):16-28.

Crawford, K.J. (2002). The strategic project office, New York, NY: Marcel Dekker.

Dai, C.X., and Wells, W.G. (2004). An exploration of project management office features and their relationship to project performance, International Journal of Project Management. 22(7):523-532.

De Baets, B., and Kerre, E. (1994). The cutting of composition, Fuzzy Sets and Systems. 62:295–309.

Delgado, M., Vila, M.A., and Voxman, W. (1998). On canonical representation of fuzzy numbers, Fuzzy Sets and Systems. 93:125–135.

Delgado, M., Vila, M.A., and Voxman,W. (1998). A fuzziness measure for fuzzy numbers: applications, Fuzzy Sets and Systems. 94:205–216.

Demir, C., and Ibrahim, K. (2010). Project Management Maturity Model (PMMM) in educational organizations. Procedia Social and Behavioral Sciences.

9:1641–1645.

Deng, H. (1999). Multicriteria analysis with fuzzy pairwise comparison. International Journal of Approximate Reasoning. 21 (3): 215–231.

Deng, H. (1999). Multicriteria analysis with fuzzy pairwise comparison. International Journal of Approximate Reasoning. 21:215–231.

DiMaggio, and P.J., Powell, W.W. (1991). The iron cage revisited: institutional isomorphism and collective rationality, in: Powell W.W., DiMaggio, P.J. (editor), The New Institutionalism in Organizational Analysis. Published in American Sociological Review. (1983) 38:147-160.

Dinsmore, P. C. (1999). Winning in Business with Enterprise Project Management.

USA: Paul C. Dinsmore.

Dinsmore, P.C. (2004). Wining in business with enterprise project management, New York: AMACOM; 1999.

Dubois, D., and Prade, H. (1978). Operations on fuzzy numbers. International Journal of Systems Science. 9(3):613–626.

Dubois, D., and Prade, H. (1980). Fuzzy Sets and Systems: Theory and Applications, Academic Press, New York.

Dubois, D., Kerre, E. E., Mesiar, R., and Prade,H. (2000). Fuzzy interval analysis, in:

D. Dubois, H. Prade (Eds.), Fundamentals of Fuzzy Sets, Handbook Series of Fuzzy Sets, Kluwer, Dordrecht. 1:483–582.

Erling S., A., and Svein A. J. (2003). Project maturity in organizations. International Journal of Project Management. 21:457–461.

Fleming, Q.W., and Koppelman, J.M. (1998). Project teams: the role of the project office. Cost Engineering. 40(8):33-36.

Fung, L.W. and Fu, K.S. (1975). An axiomatic approach to rational decision-making in a fuzzy environment, in: L.A. Zadeh et al. (Eds.), Fuzzy Sets and Their Applications to Cognitive and Decision Processes, Academic Press, New York, 227–256.

Gareis, R. (1990). Management by projects: the management strategy of the ‗new‘

project-oriented company. In: R. Gareis (editor). Handbook of management by projects, Vienna: MANZsche Verlags. 35-47.

Gien, D., Jacqmart, S., Seklouli, A., & Barad, M. (2003). An approach based on fuzzy sets for manufacturing system design. International Journal of Production Research. 41:315–335.

Gladstein, D. L. (1984). Groups in Context: A Model of Task Group Effectiveness, Administrative Science Quarterly. 29(4):499-517.

Grabisch, M. (1995). Fuzzy integral in multicriteria decisionmaking. Fuzzy Sets and Systems. 69(3):279–298.

Grant, K. P., and Pennypacker, J. S. (2006). Project Management Maturity: An Assessment of Project Management Capabilities Among and Between Selected Industries. IEEE Transactions on Engineering Management. 53(1):59-68.

Hirokawa, R.Y., Degooyer, D. and Valde, K. (2000). Using narratives to study task group effectiveness, Small Group Research. 31(5):573-591.

Hobbs, B, Aubry, M. (2007). A multi-phase research program investigating project management offices (PMOs): the results of Phase 1. International Journal of Project Management. 38(1):74–86.

Hobbs, B., Aubry, M. (2006). Identifying the structure that underlies the extreme

Montreal, Canada.

Hougaard, J. L., and H. Keiding. (1996). Representation of preferences on fuzzy measures by a fuzzy integral. Mathematical Social Sciences. 31(1):1–17.

Hsieh, T.Y., Lu S.T., Tzeng, G.H. (2004). Fuzzy MCDM approach for planning and design tenders selection in public office buildings. International Journal of Project Management. .22: 573-584.

Ihsan, Y., and Metin, D. (2010). Using the fuzzy analytic network process (ANP) for Balanced Scorecard (BSC): A case study for a manufacturing firm. Expert Systems with Applications. 37:1270–1278.

Jamshidi, M., Titli, A., Zadeh, L., & Boverie, S. (1997). Applications of fuzzy logic:

Towards high machine intelligence quotient systems. Prentice Hall.

Jiang, J. J., Klein, G., Hwang, H. G., Huang, J., and Hung, S. Y. (2004). An exploration of the relationship between software development process maturity and project performance. Information & Management. 41:279–288.

Jiang,J. J., Muhanna, W., and Klein, G. (2000). User resistance and strategies for promoting acceptance across system types. Information & Management. 37:

25–36.

Jones, M. C., and Harrison, A. W. (1996). IS project team performance: an empirical assessment. Information & Management. 31:57–65.

Kahraman, C., Ertay, T., and Buyukozkan, G. (2006). A fuzzy optimization model for QFD planning process using analytic network approach. European Journal of Operational Research. 171:390–411.

Kaufmann, A and Gupta, M.M. (1985). Introduction to Fuzzy Arithmetic: Theory and Applications, Van Nostrand Reinhold. New York.

Kaufmann, A. (1975). Introduction to the Theory of Fuzzy Subsets. Academic Press.

New York, 1.

Keeney, R. L., and H. Raiffa. (1976). Decisions with multiple objectives: preferences and value tradeoffs. John Wiley & Sons, New York.

Kendall, G.I., and Rollins, S.C. (2003). Advanced project portfolio management and the PMO: multiplying ROI at warp speed. Florida: J. Ross Publishing, Boca Raton, FL.

Kerzner, H. (2001). Strategic Planning For Project Management Using A Project Management Maturity Model. USA: John Wiley & Sons.

Kleijnen, J.P.C. (2005). An overview of design and analysis of simulation experiments for sensitivity analysis. European Journal of operational Research.

164(2):287-300.

Klir, G. J., and Yuan, B. (1995). Fuzzy Sets and Fuzzy Logic. Theory and Applications, Prentice-Hall, Upper Saddle River.

Klir, G.J., and Yuan, B. (1995). Fuzzy Sets and Fuzzy Logic: Theory and Applications, Prentice-Hall, Upper Saddle River.

Knutson, J. (1998). The project office: an evolutionary implementation plan, PM Network. 14–16.

Kruse, R., and Meyer, K. D. (1987). Statistics with Vague Data, Reidel, Dordrecht.

Kuan, M. J., Chuang, Y.C., and Tzeng, G.H. (2011). Exploring an NSD Assessment Model by Using a Fuzzy MCDM Method for Improving Service Productivity, The 19th National Conference on Fuzzy Theory and its Applications, National Formosa University, Taiwan.

Kuan, M. J., Hsiang, C. C., and Tzeng, G. W. (2012). Probing the Innovative Quality System Structure Model for NPD Process Based on Combining DANP with MCDM Model. International Journal of Innovative Computing, Information and Control. 8(8):5745~5762.

Lee, W., & Kim, S. H. (2000). Using analytic network process and goal programming for interdependent information system project selection. Computers and Operations Research. 27:367–382.

Leung, L. C., and Cao, D. (2000). On consistency and ranking of alternatives in fuzzy AHP. European Journal of Operational Research. 124:102–113.

Leung, L.C., and Cao, D. (2000). On consistency and ranking of alternatives in fuzzy AHP. European Journal of Operational Research. 124:102–113.

Li, Q., (2013). A novel Likert scale based on fuzzy sets theory. Expert Systems with Applications. 40:1609-1618.

Lin, C.J., and Wu, W.W. (2008). A causal analytical method for group decision-making under fuzzy environment. Expert Systems with Applications.

34(1):205-213.

Liou, J.J.H., and Tzeng, G.H., Chang, H.C. (2007). Airline safety measurement using a hybrid model. Journal of Air Transport Management. 13(4):243-249.

Roland, (editor), Handbook of management by projects. Vienna: MANZsche Verlags. 48-53.

Marsh, D. (2000). The programme and project support office. In: RJ. Turner, SJ.

Simister (editors), Handbook of project management. Aldershot, England: Gower.

131–144.

Meade, L. M., and Sarkis, J. (1999). Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach. International Journal of Production Research. 37:241–261.

Mehmet, S., Asil, O., Ozgur,U., Gokhan,T., Ali,T., and Dursun, D. (2012).

Development of a fuzzy ANP based SWOT analysis for the airline industry in Turkey. Expert Systems with Applications. 39:14–24.

Metin, D., Ihsan,Y., and Mustafa,K. (2008). A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system. Safety Science.

46:771–783.

Michel, T. Manon, D. (2007). Recent developments in project-based organizations.

International Journal of Project Management. 25:649-658.

Mikhailov, L. (2004). A fuzzy approach to deriving priorities from interval pairwise comparison judgments. European Journal of Operational Research.

159:687–704.

Mikhailov, L. (2004). A fuzzy approach to deriving priorities from interval pairwise comparison judgments. European Journal of Operational Research.159:687–704.

Morris Peter, W. G. (2000). Researching the unanswered questions of project management. In: Proceedings of the PMI Research Conference, 2000, Paris, PMI;

2000.

Nidumolu, S. R. (1995). The effect of coordination and uncertainty on software project performance: residual performance risk as an intervening variable.

Information Systems Research. 6 (3):191–219.

OGC. (2006). Portfolio, Programme & Project Management Maturity Model (P3M3) (Version 1.0). Office of Government Commerce (OGC). Crown. 1-77.

Opricovic, S. (1998). Multicriteria Optimization of Civil Engineering Systems, Faculty of Civil Engineering, Belgrade.

Opricovic, S. and Tzeng, G.H. (2004). Compromise solution by MCDM methods:A

comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research. 156:445-455

Ou Yang Y. P., Shieh1 H. M., Leu1 J. D., and Tzeng G. H. (2008). A Novel Hybrid MCDM Model Combined with DEMATEL and ANP with Applications.

International Journal of Operations Research. 5(3):160-168.

Ou Yang, Y. P., Shieh, H. M., Leu, J. D. and Tzeng, G. H. (2008). A novel hybrid MCDM model combined with DEMATEL and ANP with applications.

International Journal of Operations Research. 5(3):160-168.

Pagell M., and Lepine J.A. (2002). Multiple Case Studies of Team Effectiveness in Manufacturing Organizations, Journal of Operations Management. 20:619–639.

Paulk, M., Curtis, C., Chrissis, M., and Weber, C. (1993). Capability Maturity Model for Software (Version 1.1). Carnegie Mellon University, Software Engineering Institute. Downloaded from www.sei.cmu.edu/ pub/documents on 10 April 2001.

Radecki, T. (1977) Level-fuzzy sets, J. Cybernet. 7 :189–198.

Ralescu, D. A., and G. Adams. 1980. Fuzzy integral. Journal of Mathematical Analysis and Applications. 75(2):562–570.

Renato A. K., and Talles T.M. de S. (2012). Combining prospect theory and fuzzy numbers to multi-criteria decision making. Expert Systems with Applications.

39:11487-11493.

Saaty, T. L. (1980). The analytic hierarchy process. McGraw- Hill, New York.

Saaty, T. L. (1996). Decision Making with Dependence and Feedback: The Analytic Network Process, RWS Publications.

Saaty, T.L. (1996). Decision Making with Dependence and Feedback: Analytic Network Process, RWS Publications, Pittsburgh.

Saaty, T.L. (1999). Fundamentals of the analytical network process, Proceedings of ISAHP 1999. Kobe, Japan, 12-14 Aug. 48-63.

Sanayei, A., Mousavi, S. F., and Yazdankhah, A. (2010). Group decision making process for supplier selection with VIKOR under fuzzy environment. Expert Systems with Applications. 37: 24–30.

Skulmoski G. (2001). Project maturity and competence interface. Cost Engineering.

43(6):11–18.

Skulmoski, G. (2001). Project maturity and competence interface. Cost Engineering.

Sugeno, M. (1974). Theory of fuzzy integrals and its applications. Doctorial thesis.

Tokyo Institute of Technology, Tokyo, Japan.

Tamura, M., and Nagata, H. and Akazawa, K. (2002). Extraction and systems analysis of factors that prevent safety and security by structural models. Proceedings of the 41st SICE Annual Conference, Osaka, Japan. 1752-1759.

Tang, M. T., Tzeng, G. H. and Wang, S. W. (1999). A hierarchy fuzzy MCDM method for studying electronic marketing strategies in the information service industry. Journal of International Information Management. 8(1):1–22.

Terence, J., Cooke-Davies., and Andrew, A. (2003). The maturity of project management in different industries: An investigation into variations between project management models. International Journal of Project Management.

21:471–478.

Thiry, M., and Deguire, M. (2007). Recent developments in project-based organizations. International Journal of Project Management. 25:649-658.

Tolga, E., Demircan, M. L., and Kahraman, C. (2005). Operating system selection using fuzzy replacement analysis and analytic hierarchy process. International Journal of Production Economics. 97:89–117.

Toney F., and Powers R.. (1997). Best practices of project management group in large functional organizations: results of the fortune 500 Project Management Benchmarking Study. PMI. 84.

Tsaur, S. H., Tzeng, G. H. and Wang, G. C. (1997). The application of AHP and fuzzy MCDM on the evaluation study of tourist risk. Annals of Tourism Research.

24(4):796–812.

Tzeng, G. H., Chiang, C. H. and Li, C. W. (2007). Evaluating Intertwined Effects in E-learning Programs: A Novel Hybrid MCDM Model Based on Factor Analysis and DEMATEL, Expert Systems with Applications. 32(4):1028-1044.

Tzeng, G. H., Teng, M. H., Chen, J. J., and Opricovic, S. (2002). Multicriteria selection for a restaurant location in Taipei. International Journal of Hospitality Management. 21(2):171-187.

Tzeng, G.H., and Chiang, C.H. and Lin, C.W. (2007). Evaluating intertwined effects in e-learning programs: A novel hybrid MCDM model based on factor analysis and DEMATEL. Expert Systems with Applications. 32:1028-1044.

Tzeng, G.H., Lin, C.W., and Opricovic, S. (2005). Multi-criteria analysis of

ドキュメント内 関西学院大学リポジトリ (ページ 89-100)

関連したドキュメント