Basic Flow Chart for Joint Research Activities

§The Cooperative Research Service Section will email the details.

2~3 Months before

• The Cooperative Research Support Section (CRSS) contacts the organizer to explain the operation schedule of the Joint Research Activity

1~2 Months before

• The organizer submits documents (materials, list of prospective participants, programs, etc.)

• CRSS contacts and coordinates with participants receiving reimbursement for travel expenses

• Sending out the meeting information to prospective participants

During the Meeting

• Briefing on the first day of the meeting

• Operation and management of the meeting (registration required)

• Submission of questionnaires regarding the participants

After the Meeting

• Submission of the report and final version of the program (within 3 months after completion)

• Reimbursement of the travel expenses (about 1 month later)

参照

関連したドキュメント

This is a report of research done at the Research Institute for Mathematical Sciences, an International Joint Usage/Research Center located in Kyoto University.. The papers

This follows directly from [3], on using inequality (3.7). Let be any constant in the range 2.. AFUWAPE, A.U., On the Convergence of Solutions of Certain Fourth-order Different-

On the depth preserving property of the local Langlands correspondence for classical groups 11:30 – 12:30 Chi-Yun Hsu (Harvard University)9. Vanishing of cohomology of certain

This is a report of research done at the Research Institute for Mathematical Sciences, a Joint Usage/Research Center located in Kyoto University.. The papers contained herein are

This is a report ofresearch done at the Research Institute for Mathematical Sciences, a Joint Usage/Research Center located in Kyoto University3. The papers contained herein are

The problem considered here is to estimate the number of distinct elements n, that is the cardinality, of very large multisets of size N while using constant memory and doing only

Using conditional variance denotes the expected risk model which is known as the ARCH mean regression model ARCH-M.. The left is the logarithm of conditional variance which means

Conversely, any balanced tree is the graph of a fold map of the sphere whose branch set consists of unions of basic curves (as in Figure 5).. A tree is balanced if and only if its