Test Procedure SECO-NCD5700-GEVB

Test procedure requires

• One 4 channel oscilloscope

• 10V to 15V wall adapter for test board power supply (OD 6.5 mm)

• One test board provided by ON Semiconductor.

(2)

Device under test (DUT)

(3)

Connect DUT to channel number 6

(4)

1) Plug 10V to 15V DC

2/Adjust frequency around 16 kHz (measure on opened J72)

3/Adjust duty cycle to 50%

4/ Place jumper on position J72

5/Connect J58.4 to J55.2 6/ Place jumper on position J72

7/Open J60 and close J57

Prepare measurement according steps below

(5)

Measurement by scope

ChA

ChC

ChD

ChA: Measure voltage across J58.1 and GND on test point close to BNC connector

ChC: Measure voltage across G pin on the DUT and ISO GND on test point ISO3_0V

ChD: Measure voltage across shunt resistor

SHUNT_6

(6)

Same periodic signals has to be visible

(7)

Detail for positive pulse only

参照

関連したドキュメント

End point: Growth rate Exposure time: 72 h Test Type: static test Method: OECD Test Guideline 201 Toxicity to fish.

Measure loop signal high value referenced to no signal with scope DC value in step 14 22..

 To evaluate SIM_I/O, an I/O signal accommodating the datasheet specifications will be applied directly to the NCN4555 I/O device input (using either the

Connect the test setup as shown in Figure 4 and verify J3 and J5 jumpers are left open as illustrated.. Use the function generator to generate a 1 kHz PWM signal with a low level of

The NCS210R, NCS211R, NCS213R and NCS214R are voltage output, current shunt monitors (also called current sense amplifiers) which can measure voltage across shunts at

Connect the mating connector for the output voltage (J2) to the EVB and the other end to an electronic load capable of sinking at least 40 A, which is greater than the typical

Important: use the input - as the common pin (ground) for the voltage probes to avoid grounding problems. c) Turn-on the switch and make sure the device has turned-on (output

Multiple mains supply connections...: The equipment is an integrated circuit (IC) including a capacitor discharge function for building- in, must be considered when installed