<Reference>
March 22, 2013 Tokyo Electric Power Company
Air dose rates in the buildings
Data collection period (1/2)
• Unit 1: April, 2011 - February (2/18), 2013
• Unit 2: April, 2011 - February (2/18), 2013
• Unit 3: April (4/25), 2011 - February (2/18), 2013
• Unit 4: March (3/31), 2011 - February (2/18), 2013
• Unit 5: February (2/25), 2013
• Unit 6: February (2/26), 2013
Process Main Building (PM):
April, 2011 – February (2/18), 2013
Incineration Workshop Building (MSW):
May, 2011 – February (2/14), 2013
Miscellaneous Solid Waste Volume Reduction Treatment Building (HTI):
April, 2011 – February (2/13), 2013
Side Bunker Building (SB):
May, 2011 – March (3/7), 2012
Suppression Pool Water Surge-Tank Building (SPT) May, 2011 – November (11/30), 2012
Auxiliary Operation Shared Facility:
August, 2011 – January (1/18), 2013
Data collection period (2/2)
Unit 1 Reactor Building 1F
2.0
12 5.1
2.5
4.5
4.0
7
25 6.0
1280 1100
220 300
247
290 800 1820
138 600 260 127
26 48 121
220 90 45 38
90 22
3.5 0.56
6.0
5.0
4.5
7.0 7.0
0.1
4.0
0.25 0.23 0.3
0.30 0.12 0.12 0.14
X-49 Surface MAX 800
9.0
9.0
54
1.5
Floor Penetration
4700 Directly
above Funnel 2200 5.0
4.5
2.0
4.5
10
0.18
4.7 8.5 0.08
X-40 B Surface MAX 20
Unit: mSv/h
Detail
Shield installed on September 8, 2011
Upper part is 2.2m from the floor
20 Upper
part 150 3.5 Upper
part 30 2.5 Upper
part 9
7
Upper part Upper 100
part 7 Upper
part 5
1.5 11.4
Upper part
50
20
Upper part 4.5
130 Upper
part 4
Upper part 4.5Upper
part
5 10
1.5 8
1.8 2.5 3
4 4
10 2 6
2.5
1200 Upper part
1700 30
61
80 Surface of water 183
220
1FL - MBFL
Large carry-in entrance
Rooftop Unit 1
4
6
46
30
240
700
180 9
24 41
>1000 100
52
189 11.6
Unit: mSv/h
5
9
17
5.0 5.0
6.0 12 2.2 2.7
1.7
4.0
100
10 22
9
3.5 13
3.5
2.2 2.0
Debris 15 1.4
10 5.5 7.0
19 6
2.6
6 2.7 1.2 5.0
100 149
40
74 10
17
30
16 30
Puddle 200 - 300
Under the stairs
654
5
Unit: mSv/h
6
3
5 5
20 30
90 19 16 40
26 21
20 5
50 20 19 35
45
22
18 20 20
20
20
22
17
19
Unit: mSv/h
7
Unit: mSv/h
(2 - 2.5m above the floor)
8
20 10(階段踊り場)
20 8 (landing of the stairs)
5.5 (landing of the stairs)
16 Max
60 50
65
80
50 95
65 65
80
65
50
8.5
Unit: mSv/h
9
70 0.45
1.5 0.1
0.2
0.13
0.6 0.3
0.045 0.14
0.08
0.4
25
1.0 0.15
5.5 0.55
0.3 0.2
0.15 0.24
0.5 1.3
0.04 0.02 0.25
0.05
0.12
0.05
0.05 0.1
0.35 0.5 0.9
0.05
0.3 0.1 0.45
0.11 1.0
0.1 0.7
0.04
0.1 0.25
0.18 0.1
Surface of the hose 4.0
0.1 0.14
Ground 5.0
0.3
Surface of the hose
6
0.06
Surface of the hose 7.0
0.008 0.005 0.04
0.015 0.015
0.5 Surface of the hose
2.0
0.08
Surface of airlock 1.7 Bottom part of the wall
>1000 0.01
0. 04 0.25
Unit: mSv/h
Surface of airlock 1.5
10
0.18
>5000 0.03
0.08
0.04 0.05
2000 300 0.05 0.03
0.04
0.05 0.03
0.1
0.07 0.1
0.08 0.04
0.15 - 0.19 0.08
- 2
0.08 - 0.12
Railing of the overhead traveling crane
0.1 - 0.3
0.1 - 0.2
0.04 0.04
0.1 0.07
Detail of the shielding 18 20
0.03 0.035 0.1
0.5 0.04 0.03 0.04
0.025
0.35 Surface of the cask
2.2 Surface of the cask
1.8
0.03 0.045
0.015
0.04 0.055
0.06
0.025 0.04 0.03
0.03
0.02 0.045
0.04
0.035 0.04
0.04
0.04
5.0
Temporary instrumentation rack room
0.15
0.1 0.1
0.02 0.15
0.1
0.08 0.1
0.27 Surface of the filter
1.3
0.13 0.6
0.13 0.046
0.13 0.08
0.04 0.042 0.025 0.07 0.03 0.025 0.055 0.04
Unit: mSv/h
Door Shielding
Piping
Prefab
air-conditioning machine room
Surface of a tinplate
1.0
11
20 160
113 60
10 0.25 1.0
0.05 0.04
0.8
200 25 180 90
350
3.0 1.2
0.075 0.5
9.5 2.0 4.0
Unit: mSv/h
12
1号機Rw/B
新FSTR
旧FSTR
× 2.0
× 2.0
× 2.0
× 1.0
× 1.0
Water puddle
×30 ×60 ×60
×12
×30
×10
×13
×10
×15
×38
×6 0.25
0.4
0.5 1.4
2.5
6.0
4.0 5.5
7.0 0.7
0.5
0.6
1.5 0.5
1.0
0.9 - 1.3
0.05 - 0.26 Surface of the filter
3.0
Unit: mSv/h
13
0.035 0.035 0.045
0.08 0.22
0.10 0.018
0.08
Unit: mSv/h
14
0.016
0.016 0.022 0.007
0.005 0.011 0.006
0.007 0.007
0.008 0.003
0.005
0.011
0.009
0.002 0.009
0.007
0.007 0.006
0.035
0.008
Unit: mSv/h
Unit 2 Reactor Building MB1F
11
130
7 90 Surface of
accumulated water
〜66
42
48 42
85 55
40 88
38
38
51
30 82
73
88
118
53 42
47
13 20
10 6
7.2
7.0 13 10
12 6 40
1FL - MBFL
8
11 73
10 8
6
8 50
Stairs 1FL - MBFL
15
Unit: mSv/h
Unit 2 Reactor Building 1F
21
10
10
9.5
18
15
In front of the instrumentation rack
22 14
2.3
36 6.5
24 16
10
Surface of the upper pene 3000 - 4400 Surface of the upper pene 310 - 500 Close to the upper pene
20 - 63
Atmosphere inside the shielding box
2.5 - 7
Upper part of 315°side 28 - 60mSv/h
13 15
9
13
ペネ表面10〜73 40
21 Close to the upper
X-40, 27 pene 25 - 70 (1.2m from the floor) 52 - 100 (4.5 - 5.0m from the floor)
6.0 10 8.0
6.0 8.0 6.0
6.0
12 20 24
2.5 13
24
28 20
25 18
15
2.5 20
24 7.8
10 9
13
8 7
Landing 5.0 Landing
13
0.4
14
0.75 0.35
0.23 0.21
0.075
0.22 0.15 0.15
0.15 0.16 4.0
30
7.0
RCIC- 26 Surface
130 15
13 13
15
12
Unit: mSv/h
In front of the sump rack
28 8.0
Large carry-in entrance 1F
Large carry-in entrance 2F
Unit 2 Reactor Building 1F Southeast Side (Inside the TIP Room)
11 18 1.5
2.8 1.8
4.0 2.0
2.7 2.6
16 14
10 6
21 4.5
8.0 6.5 5
Unit: mSv/h
Unit 2 Reactor Building 2F
16 15
24
97.2 67.6 52
30.4
79.1 38.1
55.6 31 43 31.1 Landing
23
Upper part of the floor 29 - 33
Close to the penetration 36 - 100
3F 30
2F
56 22 25 Working floor 100
X29B/C pene 330 - 1640 10
14 16
12
Unit: mSv/h
Unit 2 Reactor Building 3F
29
40 11 38
13 12
23
18
17 11
10 Landing
8
10 4F
3F
12
10
13 21 22
40
31 22
26 34
44
Unit: mSv/h
Unit 2 Reactor Building 4F
45
10
13 5F
4F 15 Landing
12
11
14
14
11 17
22
18 16
18
Unit: mSv/h
Unit 2 Reactor Building 5F
114 190
207
250
154 47
99
81
230 67 111
45
40
78
48 60
80 77 55 78
59 128 153
356
173
133
80 139
506
376 401
415 829
880 783
530
Unit: mSv/h
(Blow-out PanelOpening)
Unit 2 Turbine Building B1F
>1000
Unit: mSv/h
Unit 2 Turbine Building 1F
0.4
0.05
0.6
0.05
0.11 0.3 0.06
0.35 0.23
7.0
0.6 0.1
1.0
0.8 0.4
0.20 0.1
0.05
0.3
2
0.06
0.7 0.50
2.0 0.80 10
0.5 0.5
0.025 0.03
1.0
0.05 1.5
0.55
0.05 0.1
0.1
0.09
0.4 0.15
0.02 0.02
0.015 0.2
0.025
4.5 3.5
2.0
2.2
1.0
0.6
0.35
0.08
0.4 0.1
0.01
0.012 0.02 0.015
0.04 0.04 0.12
0.11 0.8 4.0 0.1
0.15 0.05
0.1
9 0.40
0.2 0.45
0.5
0.04 0.02
0.04
0.04
0.015
0.1 0.5
Surface 3.0 Surface
2.5 Surface
3.5
Surface 6.0 Surface
3.0 Surface
5.0 0.70
Unit: mSv/h
0.7
Unit 2 Turbine Building 2F
80 600
40 10
2 0.04
0.1 0.02 0.06
0.015 0.02
0.3
0.05 0.05
0.13
0.1
0.1 0.1
0.02 0.05
0.017
0.035
0.05 0.023
0.018 0.025 0.018 0.028 0.023 0.02
0.04 0.18
0.02 0.16
0.50 0.040
0.08
0.020 1.9
0.045 0.25
0.22 0.02
0.04
0.020
0.025 0.07
0.25
0.04
0.02 0.02
0.03
Unit: mSv/h
Unit 2 Waste Treatment Building 1F
0.50 0.50
0.20
0.2
0.2
0.04
0.04 35
0.35
0.025 0.03
0.02 0.03
0.05 0.12 0.05
0.03
0.45
1.5 Surface of piping
12
4 2.5
0.02
Unit: mSv/h
Unit 2 Waste Treatment Building MB1F
Surface of accumulated water
〜140
15 - 20
50 - 75
4
18 100
46 190 173
125 Side of hatch
154
230 176 192
158 176 180
179
186
234 Side of hatch
360
169
158
164
186 240 193
Unit: mSv/h
Unit 3 Reactor Building 1F
34 20
27
8.0
69.8
96
74.37
30 - 40 51
42
96
37 53 50 44
46 27
155
1510 98
37.51 27 22
35
68.88
55 430
2290 200 203.1
4.5
50 35
45
25
8.0 91.6
46.2 73.22
15.91 65.59
18.50 95.83
21.74 34.12
27.50
24 36 90
13
2.2 Surface of the
floor MAX4780
50 44 45
Unit: mSv/h
Unit 3 Reactor Building 2F
Close to a valve 45
Top of the access ladder 50 Floor 60
48 45
70 75 50 32
Close to a handle of a valve
170 Shielding box
280
52 54
90 98
98
22
Unit: mSv/h
Unit 3 Reactor Building 5F
Unit: mSv/h
Unit 3 Turbine Building B1F Unit: mSv/h
Max 750
Max 400
Unit 3 Turbine Building 1F
13
4.0 1.2 4.0 4.0 3.5 4.0
5.0 2.5 1.0
0.4 6.0
3.5 0.1
1.0
0.1 0.8
0.3 10 2.5
0.2
0.08 0.17
0.4
0.2 1.8
30
1.0 3.5
0.5
4.0 4.0
Surface of transfer piping Max 12
0.2
Surface of transfer piping Max 60
1.5 4.0 0.9 1.5
0.7 10
3.0 0.4
8.0
Surface of transfer piping Max 80
0.6
0.3
0.8 0.5
90 35 0.7
12
0.1 0.6
0.25
Surface of transfer piping Max 40
Surface of transfer piping Max 40
Surface of transfer piping Max 50
0.1 0.15
0.5 Surface
0.3 4.0
1.5
0.15 60
Surface of a hose 30
0.1 0.4
3.5
0.015 0.85 0.03
0.4 0.05
0.5
8.5
1.3 1.0 1.5 0.8
2.0
0.2 0.2
3.5 3.0
0.1
Surface 2.8 Surface
3.0
Surface 7.0 Surface
2.5 Surface
2.5
0.08
0.11
Unit: mSv/h
4.0
0.8
0.5
0.4
0.7
4.0
Unit 3 Turbine Building 2F
1.0 5.0
3.0 6.0
2.6
1.5 2.0
1.0 0.65
0.25 0.25
0.3 0.12
0.27
0.3 0.27 0.32
4.0 3.5 3.0
0.25
0.25
0.6
0.6 0.3
1.5 1.0 0.4
0.12 0.4
0.7
1.0 0.6
2.0 2.0
2.0 1.5
2.0 0.2
0.4 0.5
0.3
3.0
0.8 0.18 2.5
0.32
0.35
1.2
1.5
0.55
Temporary Shielding Installation
0.55 0.2 3.0 3.0
6.0
0.5 0.5
4.0
6.0
0.5
0.3 2.0 0.65
Surface of a hose 60
Surface of a hose 50 2.5
3.0 4.0
0.12
0.035 0.075 0.7 0.5
0.6 0.65
Debris 16
Unit: mSv/h
Unit 3 Waste Treatment Building 1F
0.8 0.8
1.0
0.7
0.4 1.0
2.5
1.6 1.1 0.6
0.8
0.3
1.1 0.8 1.3 1.3
0.6 1.0 4
2.0 0.9
2.0 2.0 0.4
3.5 0.6
Control house 1.0 0.25
0.04
0.04
0.05 0.35
5.0 1.5
0.05
0.05
0.05 0.35
Surface of 1.1 piping
5.0 1.0
Unit: mSv/h
Unit 3, 4 Service Building MB1F
0.8
0.3 1.2 15
0.15
0.7
0.1
0.3 0.4 0.2 8 0.2
0.1
0.15
0.3 1
Unit: mSv/h
Unit 3, 4 Service Building 1F
0.12 1.0
0.4 3.0
0.06
0.15 0.3
0.15
0.1 0.1 0.15 0.15
0.7
0.18 0.2
0.13 0.1
0.06 0.1
1.0
2.0 1.5 1.6 0.025
0.02
0.07 0.09
0.035 0.018 0.015
Unit: mSv/h
Unit 3, 4 Service Building 2F
0.06
0.03 0.035
0.03 0.015
0.017 0.013 0.014
0.018
0.012 0.012
0.045
0.017
0.028
0.035
0.028
0.021 0.03 0.02
Unit: mSv/h
Unit 4 Reactor Building MB1F
0.035
0.04 0.2
0.1
0.2
0.15
0.2
0.1
0.12 0.07
0.3 0.15
0.15
0.15
0.02 0.2
0.2 0.1
0.15 0.15 0.25
0.25
0.35 0.35
0.26
Landing of the stairs 0.35
0.06 0.15 0.55
Unit: mSv/h
0.025
0.025
0.06
0.02
0.055 0.07
0.017
0.015
0.017
0.2
0.02 0.15 0.06
0.06 0.017
0.035 0.05
0.05
0.07 0.025 Debris piping
0.3
Average of the upper part 0.04
0.05
0.04 0.015
0.02
0.055 0.015
0.01
0.03
0.02 0.035
0.055
0.05
Unit: mSv/h
Unit 4 Reactor Building 1F
Unit 4 Reactor Building 2F
0.06 0.04
0.06
0.07
0.06
0.015
0.025
0.045
0.4 0.9
0.03
0.05
0.8
1.2 0.35 0.02
0.04 0.015 0.25
0.13 0.1 0.2 0.2 0.03
0.04
0.03 0.1
Debris 0.1
0.9 0.26
0.5 0.07
Above the scaffolding
0.2 - 0.5
Unit: mSv/h
Unit 4 Reactor Building 3F
0.04
0.05 0.7 0.2 0.6
0.25 0.25 Hx Surface
4.5
0.04 0.045
0.05 0.15 0.04
Above the scaffolding
Unit: mSv/h
Unit 4 Reactor Building 4F
0.08
0.1 0.05 0.1
0.1 0.07 0.1
0.05
0.1 0.1
0.1 0.07
0.09
0.08
0.25
0.17
0.15 0.15
0.09
Above the scaffolding 0.12
0.15
0.2 0.3
0.2
0.12 0.1
0.1
Unit: mSv/h
Unit 4 Reactor Building 5F
0.3 0.25
0.35 0.35
0.55
0.5
0.45
0.4
0.35 0.5
0.45
0.4
0.35
1.0
0.3 0.3
0.5 0.45 0.6
0.45 0.5 1.0
0.3 1.3 0.7 0.5
0.8
0.45
0.5
0.4
0.3
0.3 0.45 0.35
0.35 0.4
Overhead traveling crane
0.4
0.4 0.45 0.5
0.15
0.2 0. 15
Upper part
0.25
0.7
0.25 0.4
0.4
Debris MAX
1.0 0.3
0.4 Floor collapsed
0.75
0.18
0.35
Debris MAX
28 0.6
0.5 0.5
0.8
0.9 0.6
0.55
0.4
0.6 1.0
0.35 0.3
0.25
Unit: mSv/h
0.15
14 ×
× 23
Unit 4 Turbine Building 1F
0.15
0.2 0.2
0.3
2.0 1.7
1.0 0.4
0.5 0.1 0.3
1.0 2.1
0.22
0.2
0.1
0.5 1.5
1.3
0.2
8.0 0.068
0.3
Surface of a hose Surface of a hose 20
35 Surface of a hose
10 0.35 0.4
1.7 0.6
Surface of a hose 8
0.02
0.05 0.025
0.75 0.02
0.05
Surface of a hatch 10
2.5 0.2
Unit: mSv/h
×0.5
× 5.5
Surface of water
0.18
0.2 2.0
0.5 0.1
Unit 4 Turbine Building 2F
0.15
0.3 0.1 0.08 0.14
0.15
0.13 0.11
0.26
0.2 0.09
0.2 0.1 0.1
0.08
0.07
0.08 0.07 0.08
0.02 0.03
0.02 0.04
0.05 0.07
0.1 0.05
0.09 0.09 0.13
0.12
0.006 0.3 0.2
0.18
0.18
0.12
0.11
0.1
2.0 0.16
0.1
0.10 0.50 0.10
0.05 0.2
0.15 0.2 0.2
0.2 0.2
0.2 0.13
0.04
0.07 0.1
0.4
0.13 0.05 0.04
Debris 1.0 0.15
0.07 0.02
0.35 0.5
0.6 0.25
0.5 0.2
0.16
Unit: mSv/h
Unit 4 Waste Treatment Building 1F
0.04 1.0
2.0
0.7
0.3
0.055
0.06
0.03 0.03 0.08
0.6
0.18 0.02
0.1
0.15 0.007
0.15 2.0
0.05 0.05
Surface
6.0 2.5
1.5 2.0
1.7 Surface
6.0
0.06
Surface 5.0
4.0
4.0 1.0
1.0
3.5
1.6
1.4
0.01 0.01
0.004 0.7
1.5
1.0 1.0
1.4
Surface 5.0
Surface 6.5
Unit: mSv/h
Unit 4 Waste Treatment Building 4F, 3F, 2F
0.55 0.2
4.0 5.0
0.2 0.3 0.3
1.5 0.4
0.05
0.15
0.2
1.5
1.4 1.3 1.5
0.008
0.2
0.055
0.2
0.2
Unit: mSv/h
4F 3F
2F
Unit 5 Reactor Building B1F 0.030
0.0065
×
×
Unit: mSv/h
Unit 5 Reactor Building 1F 0.0020
0.0014
0.00070
×
× ×
Unit: mSv/h
Unit 5 Reactor Building 2F 0.0012
0.00070
×
×
Unit: mSv/h
Unit 5 Reactor Building 3F
0.00030
×
0.00090
Unit: mSv/h ×
Unit 5 Reactor Building 4F 0.00080
Unit: mSv/h ×
Unit 5 Reactor Building 5F
×
0.16
0.0012
Unit: mSv/h ×
Unit 5 Turbine Building B1F 0.00030
0.00050
×
×
Unit: mSv/h
Unit 5 Turbine Building 1F 0.00040
0.00050
×
Unit: mSv/h ×
Unit 5 Turbine Building 2F
0.00060 0.00040
× ×
Unit: mSv/h
Unit 5 Waste Treatment Building B1F 0.0055
×
Unit: mSv/h
Unit 5 Waste Treatment Building 1F
0.00030
×
Unit: mSv/h
Unit 6 Reactor Building B2F
×
0.0011
Unit: mSv/h
Unit 6 Reactor Building B1F
×
0.00090
Unit: mSv/h
Unit 6 Reactor Building 1F
×
0.013
×
0.0060
Unit: mSv/h
Unit 6 Reactor Building 2F
×
0.00070
×
0.015
Unit: mSv/h
Unit 6 Reactor Building 3F
×
0.0018
0.0025
×
Unit: mSv/h
Unit 6 Reactor Building 4F
×
0.0020
Unit: mSv/h
Unit 6 Reactor Building 5F
×
0.0010
Unit: mSv/h
Unit 6 Reactor Building 6F
×
0.00090
×
0.0013
Unit: mSv/h
Unit 6 Turbine Building B1F
×
0.00050
×
0.00030
Unit: mSv/h
Unit 6 Turbine Building 1F
×
0.00030
×
0.00030
Unit: mSv/h
Unit 6 Turbine Building 2F 0.00040 ×
×
0.0010
Unit: mSv/h
Unit 6 Waste Treatment Building B1F
×
Unit: mSv/h
Unit 6 Waste Treatment Building 1F
×
0.00030
Unit: mSv/h
Process Main Building 1F
2.2 1.2
0.03
0.80
25 16
6.5 150
22 2.7 2.0
0.5 0.6
0.8 0.6
0.055 0.14
0.4
1.0
9.0
0.15
0.3
0.12
1.5
0.45 0.1 1.0
0.03 2.0 0.5
0.15 0.07 0.11
0.2
0.015
0.030 0.030
0.060 0.020
0.030 0.08
0.028 0.75 0.6
0.65 0.5
0.01 0.027
0.25
0.08 0.10 0.05
0.02 0.06
0.05 0.02
0.02 0.7
0.7 0.7
Surface of piping 5.0
0.075
Surface of piping 7.0 Surface of piping
8.0 1.5
Process Main Building 2F
0.02 0.01 0.04
0.3 0.012
0.05
0.13 0.03
0.012 15
0.1
0.002 0.002
0.002 0.002
〜0.65
0.012
2.0 0.2
0.5
0.09 0.01
0.02 0.019
0.04
0.004 0.003
0.005 0.004
0.03
0.05 0.05
0.15
0.04
0.045 0.5
0.025 0.02 0.04
0.06 0.04
0.11
Process Main Building 3F
0.008
0.006 0.01
0.003
0.006
0.007
0.007 0.006
0.003 0.004 0.004
0.003 0.04 0.12
0.004
Above the opening 1.3
0.06
0.005
0.007
10
2.3 3.0
0.006
0.005 0.023
0.015 1.7
0.05 0.01
0.08 9.0
2.5 0.1
0.2
0.08 0.5 - 12
3.2
Surface of piping 7.0
Surface of piping 40
Process Main Building 4F
0.4
0.02 0.015
0.015 0.05
0.08 0.15
0.045
9.0
0.012
0.009
0.2 Above the opening
0.3 8.5
0.015 0.021
0.011 0.008 0.008
0.012 0.02
45 24
70
45 20 0.3
20 0.17
0.015 0.009 0.021
0.006
0.005
0.006
0.005 Above the opening
0.12
0.11
0.8
0.03 0.015 0.13 0.09
0.1 0.035
0.06 0.1
0.25 3.0 11
4.0
0.021
0.008
0.008
1.0 0.25
Incineration Workshop Building B1F
0.008
0.007
0.008 0.01 0.008
0.012 0.01
0.006
0.008
0.009 0.01 0.01
0.01 0.01
0.008 0.008
0.01
0.01
0.009
Unit: mSv/h
Incineration Workshop Building 1F
0.07 0.1 0.06
0.01
0.09
0.008
0.003
0.02 0.003
0.003 0.004
0.008 0.009 0.009
0.008 0.008
0.01 0.01
0.7 0.014
0.02
0.01 0.01 0.007
0.008 0.01
0.008 0.008
0.008
0.008 0.02
0.015
0.126
0.012 0.6
7.5
0.1 0.6
0.10 0.12
0.9 0.004
0.371 0.003
0.005 0.005
0.04 0.016
0.05 Upper side of large carry-in
entrance (overhead traveling crane area)
0.008 - 0.23
0.13 - 0.4
4.0 0.1
0.14
0.14
0.2
1.0
Maximum surface dose
0.4 Maximum surface dose
0.26
Overhead traveling crane
0.104
0.089 0.034
0.219 0.11
Unit: mSv/h
Incineration Workshop Building 2F
0.005
0.004 0.0045
0.0021 0.0015 0.0013 0.0013 0.0011 0.001 0.001
0.0012 0.001
0.0016 0.0018
Unit: mSv/h
78
Miscellaneous Solid Waste Volume Reduction Treatment Building 1F
0.05
0.35
0.22
0.025 0.006
0.008
0.08 0.035
0.065 5.0
0.15 0.06
1.1
0.065 0.003
0.055 0.09
40 10 5
2 0.16 0.05
0.15
0.15
2.2
0.075 3.5
0.2
0.11 3.0
0.035 0.075
1.0
Surface of piping 8.0
0.85 0.4
0.2 0.12
0.15 0.30
0.4
0.25 0.08
0.17
Surface of piping 11
0.25 0.15
0.03 0.06
Surface of piping 10
0.030
0.35
0.12 0.06 0.25
Surface of piping 45
5.0
Surface of piping 7.5
2.0
0.03
0.06 0.01
0.1 0.013
0.15 0.1 0.1 0.25
0.015
0.08
0.07 0.13
0.08 0.50
0.22
0.035 0.030 0.04
0.045 0.12
0.16
Surface of piping 0.8
0.14
0.15
0.10 0.12
0.25 0.62 0.75 0.55 0.42 0.32 0.45
0.50 0.50 0.45 0.45 0.35 0.40 0.60
0.08 0.04
0.50
0.50
PI-902B 2.3
PI-902A
5.0 PIT-400A 2.3
PIT-500A 1.9 0.26 0.20 0.270.300.28 0.23
0.28 0.20 0.15 0.25 0.20 0.20 PIT-300B
1.8
PI-400B 2.2
PI-500B 3.0
0.50 0.10
0.06
Miscellaneous Solid Waste Volume Reduction Treatment Building 2F
0.4
0.03
0.08 0.005
0.012
0.2 0.35
0.1 0.14
0.01 0.01 0.025
0.01 0.005
0.06
0.005 0.005 0.01
0.013
0.023 0.04
0.03
0.04
0.025 0.02
0.06
2.0
0.004
0.008 0.015 0.015
0.020
0.045
0.008
0.007
0.01
0.005
0.006 0.004
0.004 0.006
0.008 0.007
0.3 0.15
Surface of piping 40
0.055 0.03
0.01
0.007 0.003
0.006 0.004 0.004
0.005 0.02
Unit: mSv/h
Site Bunker Building B1F
0.015
Trench 0.015
0.015 0.08
0.03 0.02
0.15
0.08
0.02
0.01
0.01
0.013
0.023 0.01
0.006 0.005 0.005
4.5 1.5
Unit: mSv/h
Site Bunker Building 1F
0.005
0.04
0.02
0.002
0.008 0.04
0.085
0.03
0.006
0.002 0.002
0.003 0.16 0.06 0.025 0.012
0.04
0.02 0.02 0.02
0.018
1.1 2.5
1.6 0.035
0.020
0.1 0.08
0.06 0.055
0.03 0.04
0.035 0.04
Unit: mSv/h
Site Bunker Building 2F
0.008
Air extractor filter MAX 0.8
0.008 0.01
0.007
0.01
0.01
0.018
0.024
0.03 0.01
0.015
0.08
0.015
0.002 0.05
0.05 0.05 0.05
0.03 0.03 0.04 0.04
0.14 0.08 0.07
0.02
0.015 0.005 0.15 0.20
0.015
0.013
0.020
0.15 0.02
0.006
Unit: mSv/h
Suppression Pool Water Surge-Tank Building B1F
0.5 0.4
0.4 0.2
0.16
0.17 0.18
2.0 1.0
Unit: mSv/h
Suppression Pool Water Surge-Tank Building 1F
0.004
0.006 0.004
0.06
0.007 0.013 0.05
0.01 0.1 0.14 0.18 0.08
0.015 0.02
0.015
0.02 0.012
0.012
To HTI/B 0.08
0.08 0.1
0.18
Unit: mSv/h
1F
2F
Auxiliary Operation Shared Facility B1F
0.001
0.0022
0.0018 0.002
0.007 0.009
0.006
0.004 0.0015
0.004 0.0006
0.003
0.0015 0.004
0.002
0.0025
0.004 0.0035
Surface of waste 2.5
0.0015
0.0045
Duct Wall
Temporary scaffolding (4.0m from the floor)
0.0045 0.007
0.008 0.007
0.008
0.008
0.002 0.003
0.003 0.004
0.001 0.005
0.001
0.0004 0.001 0.50
1.0
2.0 0.080 0.13
0.30 0.0013 0.10
0.0006 0.0005
0.001 0.005 0.002
0.0007
0.005 0.0005
0.0013
0.002 0.02 0.025
0.0008 0.01
0.0012 0.0008
0.0007
0.0004
Unit: mSv/h
Auxiliary Operation Shared Facility 1F
0.030 0.02
0.012 0.02 0.03
0.007
0.3 0.012
0.02
0.011
0.009
0.02 0.008
0.022 0.011
0.45
0.010
0.01
0.011
0.008 0.015
0.045
0.006
0.04
0.016
0.015
0.035 0.02 0.015
0.007 0.003
0.0045
0.008
0.007
0.011 0.010
0.002 0.004
0.065
0.002
0.003
0.004 0.003
0.050
0.02 0.004 0.008 0.004 0.004 0.004
Surface of piping 1.5 Surface of piping
1.0
Surface of piping 2.0
Unit: mSv/h
0.040
Auxiliary Operation Shared Facility 3F
0.004 0.004 0.004
0.004
0.004 0.003
0.004
0.005 0.005
0.006
0.010
0.005
0.006 0.007 0.004 0.004 0.002
Overhead traveling crane
0.008 0.003
0.004
0.005 0.002
0.010 0.006 0.005 Fuel Handling Machine
0.009 0.003
0.003
0.005
0.004
0.003 0.005 0.003 0.003
0.003 0.002
3FL 2FL 1FL