• 検索結果がありません。

Contents(The Ritsumeikan business review Vol.57 Issue5)

N/A
N/A
Protected

Academic year: 2021

シェア "Contents(The Ritsumeikan business review Vol.57 Issue5)"

Copied!
2
0
0

読み込み中.... (全文を見る)

全文

(1)

In Commemoration of Prof. Yoichi HARA Articles:

Jumpei NISHITANI: Career Concerns and Incentive Contracts

-An Exposition of Gibbons and Murphy (1992)- ……… 1 Kentaro AZUMA: Role of Sustainability Reporting after Environmental Disaster

Stock Market Reaction to Fukushima Nuclear Accident ………23 Eri KANAMORI: Costs and Re-payments for Fukushima Nuclear Disaster ………39 Takashi MORIYA: Status and Challenges of Business Succession Education

in Japanese SMEs ………63 Toshio YAMAZAKI: Interlocking Directorate of the Supervisory Board

and the Managing Boards of Eight Large German Steel Enterprises in Other Companies after the 1965 Corporations Law:

The Cases of August Thyssen-Hütte AG, Fried. Krupp Hüttenwerke AG, Mannesmann AG, Hoesch AG, Rheinsiche Stahlwerke, Salzgitter AG,

Klöckner-Werke AG, and Gutehoffnungshütte Aktienverein ………87 Masayuki SAITO: International Brand Marketing of Henkel KGaA

in Germany after WWII ……… 127 Shaojie DOU: 300 Years MINOKICHI’s Commercial Laws and Succession ……… 147 Study:

Keizo INOUE, Akio TOKUDA: Shaping a New Mobility Society:

(2)

参照

関連したドキュメント

Reactor automatically trip (scram) Electrical power supplied by transmission lines Power provided by generator operating with diesel fuel (emergency diesel generator) Cooling by

Situation of storing and treatment of accumulated water in the building (actual record) Stored amounts in each unit building (Units 1 to 4 (including condensers and trenches)), and

The base model for stripped wave analysis is estimated by making use of the observation records of the free base obtained from this earthquake, the stripped wave analysis

Fukushima Daiichi Unit 5 was restored and achieved cold shutdown by getting access to power from the emergency DG of Unit 6 and installing a temporary underwater pump to replace

 The following measures were implemented and it has been confirmed that the total amount of accumulated radioactive water has been reduced by processing the accumulated

 To ensure that our responsibilities for the Fukushima nuclear power accident are fulfilled and that business development is optimized for business subsidiaries, TEPCO will set

2:20 am As the radiation dose over 500μSv/h was measured near the main gate (751μSv/h), it was determined that a specific incident stipulated in article 15, clause 1 of Act on

○   While trying to respond to situations at multiple reactor units due to lack of information about the cooling water injection status of Unit 2 since receiving information about