• 検索結果がありません。

Nankyoku shiryô (Antarctic Record) Vol. 56, No. 3 (November 2012) National Institute of Polar Research ERRATA (July 2014)

N/A
N/A
Protected

Academic year: 2021

シェア "Nankyoku shiryô (Antarctic Record) Vol. 56, No. 3 (November 2012) National Institute of Polar Research ERRATA (July 2014)"

Copied!
1
0
0

読み込み中.... (全文を見る)

全文

(1)

Nankyoku shiryô (Antarctic Record) Vol. 56, No. 3 (November 2012) National Institute of Polar Research

ERRATA (July 2014)

南極資料

Vol. 56, No. 3 (November 2012)

に誤りがございました

.

お詫びいたしますと共に

,

下記の通り訂正させていただきます

.

page Line error correction

261

9 Petopavlovsk-Kamcahtsky Petropavlovsk-Kamchatsky 10 (55°N,150°E) (53°N,158°E)

参照

関連したドキュメント

Due to suspension of this power panel, transfer of accumulated water at Unit 2 turbine building vertical shaft to the Centralized Radiation Waste Treatment Facility (Process

- At 9:46 am, August 30, we stopped transfer of accumulated water from the basement of turbine building of unit 3 to Centralized Radiation Waste Treatment Facility (Process

The AX8052F131 features 3 16−bit general purpose timers with SD capability, 2 output compare units for generating PWM signals, 2 input compare units to record timings of

× ダスト発生メカニズムに応じた気相移行率[-] ダスト発生メカニズムに応じた気相移行率については, 「Department of Energy, "DOE HANDBOOK:AIRBORNE

The AX8052F100 features 3 16−bit general purpose timers with SD capability, 2 output compare units for generating PWM signals, 2 input compare units to record timings of

Regarding the pressure of Primary containment vessel, it is similar to the reactor pressure, there is a temporary increase by the steam produced by the movement of reactor core to the

添付資料-4-2 燃料取り出し用カバーの構造強度及び耐震性に関する説明書 ※3 添付資料-4-3

電気設備保守グループ 設備電源グループ 所内電源グループ 配電・電路グループ 冷却・監視設備計装グループ 水処理・滞留水計装グループ