astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Introduction
Experimental area and rooms
Mechanics
Cables
Cost
Planning
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Experimental area and rooms
AD previous locations:
• Experimental area : G1
• Processing (ATCAs, PCs farm) : room 018
• Acquisition and control: room 005
• TC tests: room 014
• Detector annealing: room 006
• Stocking room : not defined
Ge detectors (AGATA and EXOGAM) space:
New layout is being studied
• Tests room
• Stocking room
• Annealing room
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Experimental area and rooms
Test room
Stocking room
Annealing room
Surface area
20 m
220 m
215 m
2Electrical
power
Main = 15kW
Main = 5kW,
Battery = 1kW / 10h
Main = 5kW
Security
Fire + anoxia
Fire + anoxia
Fire
Fluids
Water,
Compressed air
Water,
LN2 line
Water,
Compressed air
Specific
requirements
Hygrometry control,
Temperature control,
CEM.
Hygrometry control,
Temperature control,
Exhaust pipe,
Ventilation.
Network
yes
yes
no
Equipment
NIM & VXI modules,
TNT2 boards,
Power supplies,
Pulse generator,
Oscilloscope,
PC.
Table for TCs and
clovers,
LN2 tank,
LN2 Autofill hardware,
PC.
Pumps
Oven
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Mechanics
AGATA Demonstrator TCs + EXOGAM clovers + VAMOS
1 Π frame.
8 TCs and 5 EXOGAM clovers
⇒ radius from the target to the crystal
@130mm
8TCs and 8 EXOGAM clovers
⇒ radius from the target to the crystal
@234mm
VAMOS platform can rotate from 0°
to 45° .
n
fr
astructure/ Agata Week
Leg
n
aro
12-15/11/2007
M. Tripon
AGATA in VAMOS experimental area
AGATA Demonstrator@GANIL
Mechanics
radius from the target
to the crystal 130mm
with 8TC and 5 exogam
clovers
radius from the target
to the crystal 234mm
with 8TC and 8 exogam
clovers
Vamos platform can
rotate from 0° to 45°
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Mechanics
TC and flange positioning
Triple cluster
3 levels of positioning:
- 1 : Crystal and sleeve bearing
- 2 : Axis of the Al flange and
the spherical center
- 3 : Spherical center and the
target point
Aluminium flanges support
crystal
Sleevebearing
Spherical center
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Mechanics
Flanges assembling
Advantages:
-To ensure a contact between all
flanges
-To reduce machining tolerances
of the flanges.
-To dismount and position back
one flange
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
frame support
Angle bracket
The assembly of the flanges on the frame support
flanges support
GANIL requirements:
¾ The 1 Π structure is yet mounted for the GANIL commissioning.
¾Two flanges are especially machined for being easily removed.
AGATA Demonstrator@GANIL
Mechanics
n
fr
astructure/ Agata Week
Leg
n
aro
12-15/11/2007
M. Tripon
Two AD flanges are
removed from the 1Π
structure because of
the VAMOS platform
rotation
AGATA Demonstrator@GANIL
Mechanics
VAMOS+AD
VAMOS+AD
:
:
beam axis@45°
beam axis@45°
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Cables
LLP ATCAs Low Voltage Power supplies PLC crates Local PC TCs, HV boxes Digitizers VME (AGAVA) Network Ethernet Profib us Sensors LV Preamps LVs Ethernet switches Network EthernetG1
019
Time Stamping Digital Samples¾ Digitizers control (set-up, inspection lines, pulser):
- IP numbers, VNC access, rate, OF or Cu?
¾ What are links between LLP and PSA? ¾Cabling documents:
- List of the whole main cables (type, length, label)? - AD cabling diagram (from TCs to PCs farm)?
Valves
Valves
PSA PCs
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Cost
Mechanics
AD platform Target support Digitizers cabinet Alignment tools 8 k€ 7 k€ 3 k€ 5 k€23 k€
Infrastructure
Rooms renovation and utilities (electricity, LN2 line, watercooling, network, air conditioning, ..)
20 k€
Cables
Cables (Optical Fibers for AGAVA, coaxial, ) Cabling10 k€ 2 k€
12 k€
Equipment
AGAVA modulesATCA & PC farm cabinets EXOGAM autofill
Batteries (*2), (1kW, 10h) Tank (stocking room) Autofill (stocking room) Power supplies (LV and HV) NIM crate (test room)
TNT2 (*2), (test room)) Oscilloscope (test room) Pulse generator (test room)
Annealing equipment (pump, valve, oven)
12 k€ 18 k€ 7 k€ 14 k€ 15 k€ 7 k€ 10 k€ 6 k€ 10 k€ 10 k€ 6 k€ 20 k€
135 k€
TOTAL
190 k€
n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
Planning
2007
2008
2009
2010
Mechanics
Studies Manufacturing AssemblyStudies
Equipment and
cables
Studies PurchaseInstallation Cabling
Rooms
and utilities
Renovation Fitting out EXOGAM Assembly, Test AD Assembly, Test AD + EXO GA MEXOGAM
AD
Tasks
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4n
fr
astructure/ Agata Week
Leg n aro 12-15/11/2007 M. Tripon
AGATA Demonstrator@GANIL
GANIL manpower
TASKS
GANIL staff
FTE (Men. month)
Mechanics
- Design engineer
- Surveyor
- Assembly technician
12
1
1
Rooms and
infrastructure
- General resources
5
Equipment and
cables
- Electronic engineer
- Instrumentalist engineer
5
5
EXOGAM and AD
(Installation and test)
- Physicist
- Software engineer
- Hardware engineer
- Instrumentalist engineer
3
3
3
3
Action in 2008GANIL staff will take part to the AD installation and tests at LEGNARO; the schedule of the AD installation and test is requested.
Requirement:
During the AD installation and test at GANIL, the presence of AGATA experts (autofill, digitizer, LLP and software) and LEGNARO team are strongly expected