1. Unit 3 internal investigation (using underwater ROV)

STEP 1. Removal of monitoring instrument

STEP 3. Reinstallation of monitoring instrument

STEP 2. Investigation by underwater ROV

Separation valve

Underwater ROV Long shot camera Guide pipe for

investigation Pressured nitrogen

Monitoring instrument PCV

X-53penetration

1 Completed on July 11.

<Reference>

July 13, 2017 Tokyo Electric Power Company Holdings, Inc

(2)

2. Investigation plan

2

It is estimated that melted fuel had partially fallen inside the pedestal according to the analysis result. Therefore, there is a possibility of damage inside the pedestal including dropped grating and cut TIP guide pipe.

Investigation will be carried out across multiple days. First, conditions inside the

pedestal is to be checked, and review the necessity of modifying the priority order of investigation. After that, investigation restarts based on the review.

Scheduled date Contents

19 1st day of investigation: Conditions inside the pedestal are shot.

20 Necessity of modifying the plan is reviewed based on the shot image*

21 2nd day of investigation:

Investigation is conducted based on the review.

*︓Underwater ROV is mooring around X-53 penetration during the review.

(3)

3

3. Installation method of guide pipe

 The below figure shows that the double O-rings shielding gas and pressured

nitrogen forming the boundary will prevent the gas inside PCV from leaking and impacting ambient environment.

 The dust concentration will be monitored during the investigation to confirm that there is no leaked gas and no impact on ambient environment.

︓Boundary

Pressured nitrogen Cable winding

drum

Cable feeding chamber

Valve O ring Separation valve (open)

Underwater Long shot ROV

camera

Guide pipe O ring

Front seal

(4)

【Plan】: ① Pedestal basement where fuel debris may exist in is to be investigated.

② Information (conditions of X-6 and CRD rail) is to be gathered to feed back into design and development of next investigation.

4 Control rod drive (CRD)

replacement rail Pedestal opening

Platform

Control rod drive (CRD) housing

Opening (slot) PCV penetration pipe

(X-6 penetration)

Basement PCV penetration pipe

used for investigation

(X-53 penetration)

Underwater ROV

Outline view of investigation

Access entrance for workers

︓investigation area

Reference|Outline of PCV internal investigation

参照

関連したドキュメント

Structure and Dynamics of a Turbulent Puff in Pipe Flow(.

As soon as an Analytic Engine exists, it will necessarily guide the future course of the

A Black-Scholes type model for American options will be considered where the underlying asset price experiences Brownian motion with random jumps.. The mathematical problems is

Since the secondary flow cannot be described by a stream function in the present case, the deviation of stream lines compared to toroidal pipe flow cannot be studied, to interpret

A wave bifurcation is a supercritical Hopf bifurcation from a stable steady constant solution to a stable periodic and nonconstant solution.. The bifurcating solution in the case

- for the fluid going out pipe section we must solve a Dirichlet problem for an other Poisson’s equation, having the pressure drop gradient in the suction pipe as unknown

The number of pairwise nonisomorphic maximal intersecting k-uniform families of subsets of a k-admissible lattice L is bounded by a constant f (k) not depending on L.. 5

There shall be a complete physical break (air gap) between the flow outlet end of the fill.. pipe and the top or overflow rim of the reservoir tank of at least twice the