• 検索結果がありません。

Plan Change Request Plan Change Request

N/A
N/A
Protected

Academic year: 2018

シェア "Plan Change Request Plan Change Request"

Copied!
1
0
0

読み込み中.... (全文を見る)

全文

(1)

Date: To: Director General of Pro Natura Foundation Japan

Plan Change Request

Name of Group:

Name of Representative Grantee:    We would like to change our project plan as follows:

Project

Title

Change Items (Tick one of followings)

1. Change of project contents 2. Change of expenditure plan

3. Extension of project term 4. Others( ) Details

Reason of

plan

change

(Office only) Comments

参照

関連したドキュメント

This policy shows TMG’s approaches toward the formulation of our Climate Change Adaptation Plan, in order to avoid or reduce as much as possible the impacts on or damage to the

– Study on the method of reducing the dose of highly contaminated pipes by means of remote operations (removal or decontamination) and the method of installing equipment for

 To ensure that our responsibilities for the Fukushima nuclear power accident are fulfilled and that business development is optimized for business subsidiaries, TEPCO will set

Title of Change: Conversion of select ON Semiconductor, Czech Republic (Roznov) wafer fab technologies from 150mm to 200mm wafer diameter - NCV317, NCV317M.. Proposed

and sediment controls, waste chemical disposal, stormwater diversion, and covered storage and manufacturing areas - spill prevention and response procedures.. -

onsemi is notifying customers of its use of 0.8 mils Pd-coated Cu wire for JFETs devices assembled in SOT-23 at onsemi Leshan, China facility. The change requires wafer top

NOTE: For the period of 10/1/2019 through 1/10/2020, due to a data irregularity in the customer impact lists, some indirect sales customers may 

This Product Change Notification is intended to informed the customer that the Wettable Flank leadframe design and plating process are being enhanced, as tabulated below, in order