6C DOE Response to the Radiological Release from the Fukushima Daiichi Nuclear Power Plant
全文
関連したドキュメント
(5) As explained in Note 17 to the accompanying consolidated financial statements, expenses and/or losses for scrapping Fukushima Nuclear Power Station Units 1 through 4
For short-term measures based on the accident at the Fukushima Daiichi Nuclear Power Station, depth of subsidence due to deformation of the culvert having a low antiseismic
○ There was no wind pressure but we heard a sound like a balloon popping. Then everything went white and after little bit I heard a sound like pitter patter and I thought that
Reactor automatically trip (scram) Electrical power supplied by transmission lines Power provided by generator operating with diesel fuel (emergency diesel generator) Cooling by
Situation of storing and treatment of accumulated water in the building (actual record) Stored amounts in each unit building (Units 1 to 4 (including condensers and trenches)), and
March 22, 2013 Tokyo Electric Power Company. Air dose rates in
The following measures were implemented and it has been confirmed that the total amount of accumulated radioactive water has been reduced by processing the accumulated
2:20 am As the radiation dose over 500μSv/h was measured near the main gate (751μSv/h), it was determined that a specific incident stipulated in article 15, clause 1 of Act on