Day-to-Day Efforts for the Stable Supply of Electric

Power

13

Prevention of power outages and support for prompt recovery

In order to provide a stable supply of electricity in the vast and snowy harsh natural environment of Hokkaido, HEPCO has strived to reduce the number of power outages by carrying out appropriate equipment maintenance 24 hours a day, 365 days a year. In addition, HEPCO is working to shorten the duration of power outages to restore power as soon as possible in the event of an outage.

Securing a stable supply of electric power

With the shutdown of reactors at the Tomari Nuclear Power Station, HEPCO’s thermal power stations, which include some aging facilities, have continued high load oparation, increasing the risk of unscheduled stoppages at power stations.

In such circumstances, HEPCO has systematically undertaken inspections and repairs of facilities at its thermal power stations and hydroelectric power stations in order to deliver a stable supply of electric power. Regular patrols of facilities and monitoring of operations have also been strengthened in a preemptive effort to prevent any trouble.

Visual check of boiler combustion Inspecting the shaft of a water turbine

■Duration and frequency of power outages per  household per year

250

200

150

100

50

0

2.0

1.6

1.2

0.8

0.4

0.0 248

42

9 9 9 10

36

8 6

48

1.78

0.41

0.18 0.13 0.110.19 0.16 0.13 0.150.17

1981 1991 2001 2011 2012 2013 2014 2015 2016 2017(FY)

Removing a covering of snow from a distribution line

Maintenance work on a transmission line

* The duration of power outages significantly increased in FY 2013 and FY 2017  as compared to the previous fiscal year due to extended outages caused by a  blizzard in November 2012 and a typhoon in August 2016 respectively.

Duration Frequency

Frequency

(number of times/household) Duration

参照

関連したドキュメント

At TEPCO, we are pursuing the production of power with low CO 2 emission levels by means such as nuclear power generation, which emits no CO 2 ; improving increase in the thermal

Amount of Remuneration, etc. The Company does not pay to Directors who concurrently serve as Executive Officer the remuneration paid to Directors. Therefore, “Number of Persons”

For short-term measures based on the accident at the Fukushima Daiichi Nuclear Power Station, depth of subsidence due to deformation of the culvert having a low antiseismic

○ There was no wind pressure but we heard a sound like a balloon popping. Then everything went white and after little bit I heard a sound like pitter patter and I thought that

- Install high voltage power distribution board for emergency and permanent cables for reactor buildings to secure power supply in case of station black out (losing all AC

 The following measures were implemented and it has been confirmed that the total amount of accumulated radioactive water has been reduced by processing the accumulated

2:20 am As the radiation dose over 500μSv/h was measured near the main gate (751μSv/h), it was determined that a specific incident stipulated in article 15, clause 1 of Act on

As a result of the Time Transient Response Analysis utilizing the Design Basis Ground Motion (Ss), the shear strain generated in the seismic wall that remained on and below the