• 検索結果がありません。

CCSOJT0202 (Trainee's Schedule Sheet)

N/A
N/A
Protected

Academic year: 2018

シェア "CCSOJT0202 (Trainee's Schedule Sheet)"

Copied!
1
0
0

読み込み中.... (全文を見る)

全文

(1)

TRAINEE’S SCHEDULE SHEET

Document No. : CCS-OJT-02-02

Effective Date: July 28, 2017

[Date]

Name of Trainee:

Student Number: Gender:

School: Program:

Contact No: Email Address:

Academic Year: Term:

TIME MONDAY TUESDAY WEDNES

DAY THURSDAY FRIDAY SATURDAY 7:30am

9:00am 10:30a m 12:00n n

1:30pm 3:00pm 4:30pm 6:00pm

Note:

1. This schedule is based on the current load of the student and includes all enrolled courses.

2. Checked blocks are prearranged class schedule of the student and should be observed; while the empty blocks are the available schedule for OJT.

3. Practicum/OJT schedule beyond 6:00pm is not allowed. No overtime allowed.

______________________

STUDENT TRAINEE

Signature over printed name

Noted:

______________________

DEAN

Signature over printed name

Note: All information disclosed shall be used solely for legitimate purposes, specifically for regulation and monitoring of the trainee during the conduct of his OJT, and shall be processed only by authorized personnel in accordance with the Data Privacy Policy of the Institute and the Company

C

E N T E R

F

O R

C

A R E E R

S

E R V I C E S

2F Admin Building, 658 Calle Muralla Street, Intramuros Manila, 1002 Philippines I T: +63 (2)247.5000 local 1202 I TF: +63 (2)336.6102

参照

関連したドキュメント

The proof uses a set up of Seiberg Witten theory that replaces generic metrics by the construction of a localised Euler class of an infinite dimensional bundle with a Fredholm

These upper right corners are hence the places that are responsible for the streets of these lower levels, on these smaller fields (which again are and remain blocks).. The next

Left: time to solution for an increasing load for NL-BDDC and NK-BDDC for an inhomogeneous Neo-Hooke hyperelasticity problem in three dimensions and 4 096 subdomains; Right:

Using a clear and straightforward approach, we have obtained and proved inter- esting new binary digit extraction BBP-type formulas for polylogarithm constants.. Some known results

This document provides comments on the report of the thirty-third session of the Editorial and Technical Group CCC 7/5 with regard to the draft individual schedule for "LEACH

Eagle 20EW must be applied on a regular protectant fungicide schedule, not an irrigation schedule. If irrigation cycles are less frequent than the application intervals for

development and continue throughout the season on a 7- to 14-day schedule, following the resistance management guidelines. Applications may be made by ground, air or chemigation.

3.2 Application Directions: Make preventative applica- tions on a 5- to 7-day schedule. For belly rot control, the fi rst application should be made at the 1-3 leaf crop stage with